HP Performance Optimized Data Center (POD) 40c manual Site plan requirements and actions

Page 23

Site plan requirements and actions

Completing a site assessment

HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 40c G2. Consult with HP to schedule a site assessment.

A standard site assessment visit includes the following tasks:

Selecting an appropriate site for the HP POD 40c G2

Assessing the proposed site for: o Measurements for clearances

o Infrastructure for the final solution o Access to utilities

o Site pad

o Installation considerations, including locations for delivery trucks, large installation equipment (such as cranes), and storage

o Electrical infrastructure

o Chilled water infrastructure

o Facility network and security systems

Developing an engagement plan and verifying customer contacts

Discussing future development and growth plans

For a complete site assessment checklist, see "Appendix A: HP site assessment (on page 27)."

HP Site Preparation Drawing Package

After receiving a signed purchase agreement, HP provides detailed engineering drawings. These drawings contain information to assist you and your MEP team to prepare the site for POD installation. If there are areas of special interest, HP can work directly with your MEP team to provide additional assistance.

Zoning and permit requirements

You are responsible for compliance of the overall installation in accordance with all local and national regulations, ordinances, codes, and the product specifications.

Project coordination

Your Project Manager must perform the following tasks:

Coordinate with all trades prior to installation to ensure that trade conflicts are resolved.

Coordinate the installation and integration of all systems.

Site plan requirements and actions 23

Image 23
Contents Part Number August Edition AbstractPage Contents Appendix C Regulatory compliance notices HP POD 40c G2 site assessment checklistAbout this document Safety and NEC complianceOverview Fire detection and suppression Site safety and securitySite assessment Site preparationOverall system capacities Electrical power capacities critical IT powerHP POD 40c G2 capacities HP POD 40c G2 capacity limitationsSite pad HP POD 40c G2 weightDimensions and clearances Site requirementsSite requirements Safety and clearance area Future expansions Grounding requirementsHumidifier water supply Grounding feature SpecificationUtilities Chilled water supply Requirement SpecificationRequirement Location Specification Drainage10-2500 µmhos Site electrical system Power infrastructure installationElectrical power system configuration Piping materialsTransformers and switchboards Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsDemarcation box Fire box HP POD 40c G2 security Fire, safety, and security notifications Humidifier G2 is shut down Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 40c G2 installationHP POD 40c G2 storage requirements Assembly equipment locationsSite plan requirements and actions Appendix a HP site assessment HP POD 40c G2 site assessment checklistAs stated by the site engineering personnel can be Description Sign-offExisting or planned supply/return headers Security Customer responsibilities Description Sign-offProvide assistance in instances where a temporary Pre-delivery tasks HP POD 40c G2 site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryWhen installing on an elevated surface, verify that General Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off Chilled water system Description Sign-offDescription Sign-off Federal Communications Commission notice Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Regulatory compliance identification numbersCanadian notice Avis Canadien CablesGlossary Very early smoke detection apparatus Uninterruptible power systemNorth American Documentation feedback Index Index