HP Performance Optimized Data Center (POD) 40c manual Appendix C Regulatory compliance notices

Page 4

Completing a site assessment

23

HP Site Preparation Drawing Package

23

Zoning and permit requirements

23

Project coordination

23

Site planning

24

HP POD 40c G2 installation

24

Appendix A: HP site assessment

27

HP POD 40c G2 site assessment checklist

27

Appendix B: Preparing for delivery

31

Pre-delivery tasks

31

Installation prerequisites

31

HP POD 40c G2 site readiness checklist

31

Appendix C: Regulatory compliance notices

35

HP POD 40c G2 regulatory compliance

35

Regulatory compliance identification numbers

35

Federal Communications Commission notice

35

Modifications

35

Cables

36

Canadian notice (Avis Canadien)

36

Glossary

37

Documentation feedback

39

Index

40

Contents 4

Image 4
Contents Abstract Part Number August EditionPage Contents HP POD 40c G2 site assessment checklist Appendix C Regulatory compliance noticesOverview Safety and NEC complianceAbout this document Site safety and security Site assessmentSite preparation Fire detection and suppressionElectrical power capacities critical IT power HP POD 40c G2 capacitiesHP POD 40c G2 capacity limitations Overall system capacitiesHP POD 40c G2 weight Dimensions and clearancesSite requirements Site padSite requirements Safety and clearance area Grounding requirements Future expansionsUtilities Grounding feature SpecificationHumidifier water supply Requirement Specification Requirement Location SpecificationDrainage Chilled water supply10-2500 µmhos Power infrastructure installation Electrical power system configurationPiping materials Site electrical systemTransformers and switchboards Supported facility connections Environmental control systemAdditional POD connections Connection portalsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsHP POD 40c G2 installation Site planningAssembly equipment locations HP POD 40c G2 storage requirementsSite plan requirements and actions HP POD 40c G2 site assessment checklist Appendix a HP site assessmentDescription Sign-off As stated by the site engineering personnel can beCustomer responsibilities Description Sign-off Existing or planned supply/return headers SecurityProvide assistance in instances where a temporary HP POD 40c G2 site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksWhen installing on an elevated surface, verify that Power requirements Description Sign-off General water supply Description Sign-offChilled water system Description Sign-off General Description Sign-offDescription Sign-off Appendix C Regulatory compliance notices HP POD 40c G2 regulatory complianceRegulatory compliance identification numbers Federal Communications Commission noticeCables Canadian notice Avis CanadienGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb