HP Performance Optimized Data Center (POD) 240a manual Managing the ECS from the HP POD 240e NA

Page 37

Top view shown

Managing the ECS from the HP POD 240e NA

The ECS interface is viewed directly from the ECS screen on the IT section A control cabinet door. For more information, see "ECS touchscreen and EPO indicators (on page 20)."

Environmental control system 37

Image 37
Contents Part Number November Edition AbstractPage Contents Air filter sensor HP POD 240e NA optional components Power feeder pull boxesBefore you contact HP HP contact information Regulatory compliance noticesComponent safety Operator safetyOverview Before you beginFire detection Preventative maintenanceEnvironmental considerations Structural component identification Component identificationComponent Description Parts and part number identificationExit sign locations Life safety component identificationComponent identification Component identification End view shown Component Description Electrical power component identificationMain breaker locations Reminds you that the electrical panels must only be Electrical power disconnect map label location End view shown Callout Electrical safety label DescriptionUPS Control cabinet component identificationIT section B control cabinet Component Description Security component identificationTop view shown Component Description RacksLife safety overview Life safety systemsEPO system ECS touchscreen and EPO indicators Component Indicator color Description Battery backup during an EPO eventEPO modes EPO accidental activationVesda air sampling smoke detection system Fire detection systemManual fire pulls Fire alarm indicators Fire alarm panelFire detection sequence of operations Emergency egress Power safety Power, electrical, and controlsSite electrical system Grounding and bondingLightning protection CapacitiesElectrical panel labels Power feedersPower distribution Adiabatic system Power distribution electrical busway systemEnd view shown Feature Specification Wire color codePanel schedules Electrical busways Wire color DescriptionPage Drop boxes Rack powerLighting Feature Specification Environmental control system Using the ECS Environmental control system overview Components of the ECS Facility connections to the ECSSatellite control boxes Connecting to the ECS through connection portals Connecting to the ECS through the demarcation boxManaging the ECS from the HP POD 240e NA Configuring the ECS Environmental control system Logging in remotely to the ECS Click Connect Locating the ECS IP addressNavigating the ECS interface Password protectedView Logging in to the ECS touchscreenTop screen Callout Icon name DescriptionCA RH Information displayed Description AD detail screenAisle in relation to the external ambient AD detail screen displays the following alarm conditions Charts screenAlarm displayed Description Operation displayed DescriptionPsychrometric chart Electrical Cabinets screen Alarms chartControls Network screen Alarms screen Stats screen Indicates the cold aisle combination temperature Control settings ConfigureHMI settings Setting the Min and Max range for alarms Setting the Min and Max temperature and RH setpointsManaging the ECS system US Customary o MetricSetting the IP address Setting the offset alarmForcing an alarm Maintaining the ECS parameters Temperature and pressure sensorsCallout Sensor Quantity per Description IT section Controlling the hot aisle fans Adiabatic unitsCallout Sensor Quantity per Description Hot aisle Overview AHU systemAdiabatic components Adiabatic media AHU theory of operationAHU system AHU system Static pressure control Networking IT networking and communicationsConnection portals Demarcation box Adding a phone Fire boxIT networking and communications Air filter sensor Standard componentsOptional components Power feeder pull boxesHP POD 240e NA optional components General specifications SpecificationsRack specifications Features SpecificationsEnvironmental specifications Periodic maintenance MaintenancePreparing the Adiabatic units for winter Component Description Supply header gravity drain Adiabatic unit by unit blowdown Supply header blowdown Standard power up procedure Power up procedurePower up checklist Standard power up procedureElectrical Cold weather power up procedureCold weather power up checklist Cold weather operation Full power down procedure Power down procedureBefore you contact HP Contacting HPHP contact information Regulatory compliance notices Safety and NEC complianceHP POD 240e NA regulatory compliance Warranty information Safety and regulatory complianceGlossary North American Outside air Power distribution unitProgrammable logic controller Performance-Optimized DatacenterEnclosure of sufficient size to enable entry of personnel Power usage efficiency Relative humidityUninterruptible power system Pounds per square inchDocumentation feedback Index Index Warranty Winterize, Hvac units 74 wire color code Safety, component Safety, power connections
Related manuals
Manual 8 pages 155 b Manual 26 pages 60.09 Kb Manual 39 pages 18.56 Kb