Raypak 0030B, 0090B, 0135B manual

Page 39

www.raypak.com

Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 FAX (800) 872-9725 Raypak Canada LTD, 2805 Slough Street, Mississauga, Ontario, Canada L4T 1G2 (905) 677-7999 FAX (905) 677-8036 Litho in U.S.A.

Image 39
Contents For Your Safety Installation Operating InstructionsContents General Specifications Specifications and DimensionsReceiving Equipment Clearancerequirements Installation ProceduresCode Requirements Mounting BaseFig. #8198.0 Venting ConnectionsFig.# Common VentsLocation Vent Damper InstallationInstalling the Vent Damper in Horizontal & Vertical Vent D80D General Wiring DiagramMounting Flair Damper Vent Damper Position IndicatorSystem Schematic Ladder Diagram Vent Damper OperationConnection Diagram GAS Supply Connections GaspressureWater Connections & System Piping SINGLE-ZONEPIPING Piping DiagramsZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Fig.# Electrical WiringWiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device Sequence of Operation Intermittent Ignition Device IID Servicing ProceduresGeneral Location of Controls Control BOX Component Locations Models 135What to do if YOU Smell GAS START-UPPROCEDURESFor Automatic Ignition Models Honeywell Pilot Robertshaw PilotTo Turn OFF GAS to Boiler SHUT-DOWNPROCEDUREFor Automatic Ignition Systems Flame Failure Inspection Procedures BurnersInspectionprocedures Safe SHUT-DOWN Tests Limit ActionRepairprocedures Raypak Tube Cleaning KITCombustion Chamber Removal Heat Exchanger RE-ASSEMBLYImportant Notice Troubleshooting GuidePiping ADJUSTMENT/REPLACEMENTOF Components RAYPAK, INC Replacement Parts ListPage Page Page Limited Parts Warranty