Raypak 0135B, 0030B, 0090B manual Wiring Diagram System with 3 Zone Pumps

Page 20

WIRING DIAGRAM: System with (3) Zone Pumps

Fig. #2232e

NOTE: Check VA rating of each relay coil. Total load must not exceed VA rating of transformer.

WIRING DIAGRAM: Power Vent System w/ Zone Valve

Fig. #2233e

Fig. #2234e

20

Image 20
Contents Installation Operating Instructions For Your SafetyContents Receiving Equipment General SpecificationsSpecifications and Dimensions Installation Procedures Code RequirementsMounting Base ClearancerequirementsVenting Connections Fig. #8198.0Common Vents Fig.#Vent Damper Installation LocationMounting Installing the Vent Damper in Horizontal & Vertical VentD80D General Wiring Diagram Vent Damper Position Indicator System Schematic Ladder DiagramVent Damper Operation Flair DamperConnection Diagram Water Connections & System Piping GAS Supply ConnectionsGaspressure Piping Diagrams SINGLE-ZONEPIPINGZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Electrical Wiring Fig.#Wiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device Servicing Procedures General Location of ControlsControl BOX Component Locations Models 135 Sequence of Operation Intermittent Ignition Device IIDSTART-UPPROCEDURES What to do if YOU Smell GASHoneywell Pilot Robertshaw Pilot For Automatic Ignition ModelsSHUT-DOWNPROCEDURE To Turn OFF GAS to BoilerFor Automatic Ignition Systems Inspection Procedures Burners InspectionproceduresSafe SHUT-DOWN Tests Limit Action Flame FailureRaypak Tube Cleaning KIT RepairproceduresHeat Exchanger RE-ASSEMBLY Combustion Chamber RemovalTroubleshooting Guide Important NoticePiping ADJUSTMENT/REPLACEMENTOF Components Replacement Parts List RAYPAK, INCPage Page Page Limited Parts Warranty