Raypak 0090B, 0030B, 0135B manual Connection Diagram

Page 10

CONNECTION DIAGRAM

10

Image 10
Contents Installation Operating Instructions For Your SafetyContents Specifications and Dimensions General SpecificationsReceiving Equipment Mounting Base Installation ProceduresCode Requirements ClearancerequirementsVenting Connections Fig. #8198.0Common Vents Fig.#Vent Damper Installation LocationD80D General Wiring Diagram Installing the Vent Damper in Horizontal & Vertical VentMounting Vent Damper Operation Vent Damper Position IndicatorSystem Schematic Ladder Diagram Flair DamperConnection Diagram Gaspressure GAS Supply ConnectionsWater Connections & System Piping Piping Diagrams SINGLE-ZONEPIPINGZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Electrical Wiring Fig.#Wiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device Control BOX Component Locations Models 135 Servicing ProceduresGeneral Location of Controls Sequence of Operation Intermittent Ignition Device IIDSTART-UPPROCEDURES What to do if YOU Smell GASHoneywell Pilot Robertshaw Pilot For Automatic Ignition ModelsSHUT-DOWNPROCEDURE To Turn OFF GAS to BoilerFor Automatic Ignition Systems Safe SHUT-DOWN Tests Limit Action Inspection Procedures BurnersInspectionprocedures Flame FailureRaypak Tube Cleaning KIT RepairproceduresHeat Exchanger RE-ASSEMBLY Combustion Chamber RemovalTroubleshooting Guide Important NoticePiping ADJUSTMENT/REPLACEMENTOF Components Replacement Parts List RAYPAK, INCPage Page Page Limited Parts Warranty