Raypak 0030B, 0090B, 0135B manual Heat Exchanger RE-ASSEMBLY, Combustion Chamber Removal

Page 30

6.Remove combustion chamber clips at the four corners of the heat exchanger.

7.Lift heat exchanger straight up using caution not to damage refractory.

Fig# 9337

HEAT EXCHANGER RE-ASSEMBLY

1.Heat exchanger water header O-rings should be replaced with new ones.

2.Install in/out and return water headers and

install header retainer nuts and torque nuts evenly.

3.Replace "V" baffles.

4.Install thermostat sensing bulbs in header wells and replace bulb retaining clips.

5.Install inlet and return pipes in water headers using pipe thread sealant.

6.Install water pressure relief valve, flow switch, and low water cut-off devices if so equipped.

7.Open water supply and return shut-off valves. Fill boiler and water piping system with water. Check

boiler and piping system for leaks at full line pres- sure. Run system circulating pump for a minimum of 1/2 hour with boiler shut off.

8.Shut down entire system and vent all radiation units and high points in system piping. Check all strain- ers for debris. Expansion tank water level should be at the 1/4 mark and the balance of the tank filled with air (when using Air-X-Tank).

9.Install flue collector, jacket top and inspection pan- els. Install top holding screws. Install draft diverter and vent piping if so equipped.

10.If gas piping was disconnected, reconnect gas piping system and check for leakage using a soap solution.

11.Check for correct water pressure and water level in the system. Make sure that system pump operates immediately on the call for heat. The system is ready for operation.

13.Within two (2) days of start-up, recheck all air vents and expansion tank levels.

COMBUSTION CHAMBER REMOVAL

To remove combustion chamber you must first have removed the heat exchanger. Unbolt metal com- bustion chamber retainer from top and remove com- bustion chamber panels individually.

30

Image 30
Contents Installation Operating Instructions For Your SafetyContents General Specifications Specifications and DimensionsReceiving Equipment Mounting Base Installation ProceduresCode Requirements ClearancerequirementsVenting Connections Fig. #8198.0Common Vents Fig.#Vent Damper Installation LocationInstalling the Vent Damper in Horizontal & Vertical Vent D80D General Wiring DiagramMounting Vent Damper Operation Vent Damper Position IndicatorSystem Schematic Ladder Diagram Flair DamperConnection Diagram GAS Supply Connections GaspressureWater Connections & System Piping Piping Diagrams SINGLE-ZONEPIPINGZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Electrical Wiring Fig.#Wiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device Control BOX Component Locations Models 135 Servicing ProceduresGeneral Location of Controls Sequence of Operation Intermittent Ignition Device IIDSTART-UPPROCEDURES What to do if YOU Smell GASHoneywell Pilot Robertshaw Pilot For Automatic Ignition ModelsSHUT-DOWNPROCEDURE To Turn OFF GAS to BoilerFor Automatic Ignition Systems Safe SHUT-DOWN Tests Limit Action Inspection Procedures BurnersInspectionprocedures Flame FailureRaypak Tube Cleaning KIT RepairproceduresHeat Exchanger RE-ASSEMBLY Combustion Chamber RemovalTroubleshooting Guide Important NoticePiping ADJUSTMENT/REPLACEMENTOF Components Replacement Parts List RAYPAK, INCPage Page Page Limited Parts Warranty