Raypak 0090B, 0030B, 0135B manual Troubleshooting Guide, Important Notice

Page 31

TROUBLESHOOTING GUIDE

IMPORTANT NOTICE

These instructions are primarily intended for the use of qualified personnel specifically trained and experienced in the installation of this type of heating equipment and related system components. Installation and service personnel may be required by some states to be licensed. Persons not qualified shall not attempt to install this equipment nor attempt repairs according to these instructions.

PROBLEM

CAUSES

SOLUTIONS

1)When room thermostat is turned on,

1)No power to the boiler.

1)Check circuit breakers, disconnect

boiler does not operate.

 

switch. Make sure power is on.

 

2)Defective room thermostat or discon-

2)Check continuity on thermostat and

 

nected wire in thermostat circuit.

wiring circuit. Replace thermostat, or

 

 

repair wiring connections.

 

3)Defective transformer.

3) Check secondary voltage. If no 24V,

 

 

replace transformer.

 

4)Defective pump relay.

4) Check relay coil or contacts. Replace

 

 

as required.

 

5)Defective pump.

5) Replace pump.

 

 

 

2)When room thermostat is calling for

1)For standing pilot models pilot,

1)Light pilot burner. (Follow lighting

 

heat, pump is on, but burners will not

burner not lighted.

instructions on rating plate.)

turn on.

2)If pilot burner will not stay lighted,

2)Check thermocouple MV generation.

 

thermocouple or gas valve may be

If less than 25MV (open circuit), re-

 

defective.

place thermocouple. If between 25-

 

 

35 MV, replace gas valve.

 

3)Gas knob in "Pilot" position.

3)Turn knob to "ON" position.

 

4)For automatic ignition models,

4)Turn gas knob to "ON". If ignition

 

gas valve knob is in "off" position.

module locks out, reset by interrupt-

 

 

ing power to boiler.

 

5)Vent switch is open.

5) Check for blockage of venting system

 

 

or disconnected vent piping. After

 

 

problem is corrected push button to

 

 

reset, or replace single-use type vent

 

 

switch.

 

6)Roll-out switch is open.

6)Check for blockage of flue or sooted

 

 

heat exchanger. After problem is

 

 

corrected push button to reset or re-

 

 

place single use type roll-out switch.

 

7)High limit is open.

7)Setting may be too low. Check water

 

 

flow and adjust setting to obtain 20-

 

 

30°F temperature rise.

 

8) Fast Response Temperature

8)Red LED on circuit board will be ON

 

Sensor probe is defective.

to indicate a loose sensor connection

 

 

or a shorted sensor. Check terminal

 

 

connectors or replace sensor as re-

 

 

quired.

 

 

NOTE: Red LED will also be ON if

 

 

sensor temperature exceeds 300°F or

 

 

drops below - 20°F. It will turn OFF

 

 

when sensor temperature returns to

 

 

the proper range. Yellow LED will be

 

 

ON if temperature exceeds 240°F. It will

 

 

turn off when sensor temperature falls

 

 

below 180°F. When either Red or Yel-

 

 

low LED is ON, boiler will be shut down.

 

9) Fast Response Temperature

9)Check voltage across output and

 

sensor board is defective.

common terminals. If no 24V is pres-

 

 

ent, replace board.

31

Image 31
Contents For Your Safety Installation Operating InstructionsContents Specifications and Dimensions General SpecificationsReceiving Equipment Clearancerequirements Installation ProceduresCode Requirements Mounting BaseFig. #8198.0 Venting ConnectionsFig.# Common VentsLocation Vent Damper InstallationD80D General Wiring Diagram Installing the Vent Damper in Horizontal & Vertical VentMounting Flair Damper Vent Damper Position IndicatorSystem Schematic Ladder Diagram Vent Damper OperationConnection Diagram Gaspressure GAS Supply ConnectionsWater Connections & System Piping SINGLE-ZONEPIPING Piping DiagramsZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Fig.# Electrical WiringWiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device Sequence of Operation Intermittent Ignition Device IID Servicing ProceduresGeneral Location of Controls Control BOX Component Locations Models 135What to do if YOU Smell GAS START-UPPROCEDURESFor Automatic Ignition Models Honeywell Pilot Robertshaw PilotTo Turn OFF GAS to Boiler SHUT-DOWNPROCEDUREFor Automatic Ignition Systems Flame Failure Inspection Procedures BurnersInspectionprocedures Safe SHUT-DOWN Tests Limit ActionRepairprocedures Raypak Tube Cleaning KITCombustion Chamber Removal Heat Exchanger RE-ASSEMBLYImportant Notice Troubleshooting GuidePiping ADJUSTMENT/REPLACEMENTOF Components RAYPAK, INC Replacement Parts ListPage Page Page Limited Parts Warranty