Raypak 0030B, 0090B, 0135B manual Common Vents, Fig.#

Page 6

The weight of the vent stack or chimney must not rest on the boiler's drafthood. Support must be provided in compliance with applicable codes. The boiler top and drafthoodmustbereadilyremovableformaintenanceand inspection. Vent pipe should be adequately supported to maintain proper clearances from combustible construc- tion.

Type "B" double-wall (or equivalent vent pipe is recommended. However single-wall metal vent pipe may be used as specified in the latest edition of the National Flue Gas Code ANSI Z 223.1.

Lowest Discharge

Opening

Listed Cap

 

 

Listed Gas Vent

 

 

 

 

X

 

 

12

 

 

 

Roof Pitch is X/12

 

 

H - Minimum Height from

 

 

Roof to Lowest

 

 

Discharge Opening

 

Roof Pitch

H (Min. Ft.)

 

Flat to 6/12

1.0

 

 

6/12 to 7/12

1.25

 

 

Over 7/12 to 8/12

1.5

 

 

Over 8/12 to 9/12

2.0

 

 

Over 9/12 to 10/12

2.5

 

 

Over 10/12 to 11/12

3.25

 

 

Over 11/12 to 12/12

4.0

 

 

Over 12/12 to 14/12

5.0

 

 

Over 14/12 to 16/12

6.0

 

 

Over 16/12 to 18/12

7.0

 

 

Over 18/12 to 20/12

7.5

 

 

Over 20/12 to 21/12

8.0

 

Fig.# 8191

WARNING: These boilers must not be connected into any portion of mechanical draft systems operating under positive pressure. To do so may cause the flue products to be discharged into the living space causing serious health injury.

For connections to gas vents or chimneys, vent installations shall be in accordance with Part 7, Venting of Equipment, of the National Fuel Gas Code, ANSI Z223.1, or applicable provisions of the local building codes.

COMMON VENTS

Manifolds that connect more than one boiler to a common chimney must be sized to handle the combined load.

Consult available guides for proper sizing of the manifold and the chimney.

At no time should the area be less than the area of the largest outlet.

Fig. #9001

6

Image 6
Contents Installation Operating Instructions For Your SafetyContents General Specifications Specifications and DimensionsReceiving Equipment Mounting Base Installation ProceduresCode Requirements ClearancerequirementsVenting Connections Fig. #8198.0Common Vents Fig.#Vent Damper Installation LocationInstalling the Vent Damper in Horizontal & Vertical Vent D80D General Wiring DiagramMounting Vent Damper Operation Vent Damper Position IndicatorSystem Schematic Ladder Diagram Flair DamperConnection Diagram GAS Supply Connections GaspressureWater Connections & System Piping Piping Diagrams SINGLE-ZONEPIPINGZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Electrical Wiring Fig.#Wiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device Control BOX Component Locations Models 135 Servicing ProceduresGeneral Location of Controls Sequence of Operation Intermittent Ignition Device IIDSTART-UPPROCEDURES What to do if YOU Smell GASHoneywell Pilot Robertshaw Pilot For Automatic Ignition ModelsSHUT-DOWNPROCEDURE To Turn OFF GAS to BoilerFor Automatic Ignition Systems Safe SHUT-DOWN Tests Limit Action Inspection Procedures BurnersInspectionprocedures Flame FailureRaypak Tube Cleaning KIT RepairproceduresHeat Exchanger RE-ASSEMBLY Combustion Chamber RemovalTroubleshooting Guide Important NoticePiping ADJUSTMENT/REPLACEMENTOF Components Replacement Parts List RAYPAK, INCPage Page Page Limited Parts Warranty