Raypak 0030B, 0090B, 0135B Vent Damper Operation, Vent Damper Position Indicator, Flair Damper

Page 9

VENT DAMPER OPERATION

For safe, efficient operation, the vent damper and all flue-product-carrying areas of the appliance must be checked annually, with particular attention given to deterioration from corrosion or other sources.

Check vent damper operation as follows:

1. When the boiler is off, check that the vent damper position indicator points to the closed position, below.

DAMPERPOSITION

DAMPERPOSITION

INDICATOR

INDICATOR

NOTE: To place vent damper in the open position to allow burner operation:

Turn the power off. Turn the damper blade to fully open position (arrow facing same direction as vent pipe). Turn power on.

DAMPER OPEN

DAMPER CLOSED

Fig. # 8181.0

VENT DAMPER POSITION INDICATOR

2.Turn the thermostat or controller up to call for heat and check that the vent damper indicator points to the open position, below.

3.Turn the thermostat or controller down again and check that the vent damper position indicator returns to the closed position.

THE VENT DAMPER MUST BE INSPECTED AT LEAST ONCE A YEAR BY A TRAINED, EXPERIENCED

SERVICE TECHNICIAN. THE NAME OF THE PERSON WHO ORIGINALLY INSTALLED YOUR VENT DAMPER IS SHOWN ON THE INSTALLATION LABEL. DAMPER MUST BE IN OPEN POSITION WHEN BOILER MAIN BURNERS ARE OPERATING.

FLAIR DAMPER

 

SYSTEM SCHEMATIC

LEGEND

LADDER DIAGRAM

 

 

R

 

 

 

 

R2

SS2

ES

 

SC

 

SS 1

 

 

R1

 

 

 

 

 

JUMPER

 

 

M

 

 

 

1

2

3

4

 

GV

HL

 

 

 

 

 

TH

 

24 VAC

 

 

 

 

TR

 

 

 

120 VAC

 

 

L

60Hz

L

 

 

 

1

2

 

 

M - Damper motor R - Relay

ES - End switch

SS1 - N/C Safety switch SS2 - N/O Safety switch contacts

TR - Transformer 120/24V HL - High limit

GV - 24V gas valve*

TH - Thermostat, heating, low voltage

J - Jumper

Note: Circuit shown with damper in closed position, no call for heat.

Fig. #9002

24

V

AC

 

TH

R

 

 

 

 

 

2

 

 

 

4

 

 

GV

 

 

SS

3

J

HL

 

1

ES

 

 

 

 

SS

R

 

 

2

2

SC

 

 

 

M

 

 

R 1

 

 

 

Fig. #9003

9

Image 9
Contents For Your Safety Installation Operating InstructionsContents General Specifications Specifications and DimensionsReceiving Equipment Code Requirements Installation ProceduresMounting Base ClearancerequirementsFig. #8198.0 Venting ConnectionsFig.# Common VentsLocation Vent Damper InstallationInstalling the Vent Damper in Horizontal & Vertical Vent D80D General Wiring DiagramMounting System Schematic Ladder Diagram Vent Damper Position IndicatorVent Damper Operation Flair DamperConnection Diagram GAS Supply Connections GaspressureWater Connections & System Piping SINGLE-ZONEPIPING Piping DiagramsZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Fig.# Electrical WiringWiring Diagram KEY Page Page Wiring Diagram Single-Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut-off Device General Location of Controls Servicing ProceduresControl BOX Component Locations Models 135 Sequence of Operation Intermittent Ignition Device IIDWhat to do if YOU Smell GAS START-UPPROCEDURESFor Automatic Ignition Models Honeywell Pilot Robertshaw PilotTo Turn OFF GAS to Boiler SHUT-DOWNPROCEDUREFor Automatic Ignition Systems Inspectionprocedures Inspection Procedures BurnersSafe SHUT-DOWN Tests Limit Action Flame FailureRepairprocedures Raypak Tube Cleaning KITCombustion Chamber Removal Heat Exchanger RE-ASSEMBLYImportant Notice Troubleshooting GuidePiping ADJUSTMENT/REPLACEMENTOF Components RAYPAK, INC Replacement Parts ListPage Page Page Limited Parts Warranty