Raypak
0030B, 0090B, 0135B
manual
Troubleshooting
Specification
Install
Parts list
D80D General Wiring Diagram
Vent Damper Position Indicator
Electrical Wiring
Warranty
Heat Exchanger RE-ASSEMBLY
Servicing Procedures
Page 36
36
Page 35
Page 37
Image 36
Page 35
Page 37
Contents
Installation Operating Instructions
For Your Safety
Contents
General Specifications
Specifications and Dimensions
Receiving Equipment
Installation Procedures
Code Requirements
Mounting Base
Clearancerequirements
Venting Connections
Fig. #8198.0
Common Vents
Fig.#
Vent Damper Installation
Location
Installing the Vent Damper in Horizontal & Vertical Vent
D80D General Wiring Diagram
Mounting
Vent Damper Position Indicator
System Schematic Ladder Diagram
Vent Damper Operation
Flair Damper
Connection Diagram
GAS Supply Connections
Gaspressure
Water Connections & System Piping
Piping Diagrams
SINGLE-ZONEPIPING
Zone Heating with Indirect Domestic HOT Water Supply
Multiple Zones with Zone Valves
Electrical Wiring
Fig.#
Wiring Diagram KEY
Page
Page
Wiring Diagram Single-Zone Taco Valve
Wiring Diagram System with 3 Zone Pumps
Fig. #2223.2e
Wiring Diagram Standing Pilot With Low Water Cut-off Device
Servicing Procedures
General Location of Controls
Control BOX Component Locations Models 135
Sequence of Operation Intermittent Ignition Device IID
START-UPPROCEDURES
What to do if YOU Smell GAS
Honeywell Pilot Robertshaw Pilot
For Automatic Ignition Models
SHUT-DOWNPROCEDURE
To Turn OFF GAS to Boiler
For Automatic Ignition Systems
Inspection Procedures Burners
Inspectionprocedures
Safe SHUT-DOWN Tests Limit Action
Flame Failure
Raypak Tube Cleaning KIT
Repairprocedures
Heat Exchanger RE-ASSEMBLY
Combustion Chamber Removal
Troubleshooting Guide
Important Notice
Piping
ADJUSTMENT/REPLACEMENTOF Components
Replacement Parts List
RAYPAK, INC
Page
Page
Page
Limited Parts Warranty
Related pages
How do I properly use the Energizer CHUSB charger?
Get usage tips
Top
Page
Image
Contents