Stovax Studio 22 manual Site Requirements, Flue and Chimney Requirements

Page 12

INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

1. Flue and Chimney Requirements

Note: This appliance must only be installed with the flue supplied.

You must adhere to the following:

1.1The flue must be sited in accordance with BS5440: Part 1 (latest edition). See Diagram 1.

1.2Fit a guard to protect people from any terminal less than 2 metres above any access such as level ground, a balcony or above a flat roof.

1.3All vertical and horizontal flues must be securely fixed and fire precautions followed in accordance with local and national codes of practice.

1.4A restrictor may be required. Refer to Technical Specifications on page 9.

1.5Three types of flue termination are possible, rear, top exit horizontal and top exit vertical. To measure for a top exit horizontal terminal:

Decide on the terminal position

Measure the height from the top of the appliance to the centre of the required outlet.

For minimum and maximum flue dimensions see Section 2, Flue Options.

Allow enough room either above or to the side of the appliance to assemble the flue on top

Assemble a horizontal flue in the following order:

-Vertical section

-90° elbow

-Horizontal plus terminal

Support the opening of a masonry installation with a lintel.

1.7Only the horizontal terminal section can be reduced in size.

1

UK Dimensions

12

Image 12
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECFLUE CHECK FailGAS CHECK MAN Mode Increasing TemperatureDecreasing Temperature GeneralTemp Mode Timer ModeLOW Battery Setting the TimeCleaning the Studio Changing the Studio BatteriesAll models Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightTechnical Specification Covering the Following ModelsStudio 22 BF 8704BFLEC P8704BFLEC CATPacking Checklist Qty Description Fixing Kit containingSteel Frame Dimensions Size mm Profil Frame Dimensions Size mmBauhaus Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Rear ExitTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplyAppliance Location Installation Safety PrecautionsInstallation of the appliance AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly Wall Thickness MIN MAXTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Requirements CheckIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameMaIN Control Assembly Vermiculite PanelsMaIN Burner Pilot Unit Assembly Pilot Burner BracketElectrode Ignition Lead GAS ValvePilot Injector ThermocoupleMagnetic safety valve Control BOXMain injector Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component1ST Service 3RD Service5TH Service 7TH ServiceMember of the Stovax Group