Stovax Studio 22 manual Vermiculite Panels, MaIN Burner, MaIN Control Assembly

Page 32

SERVICING INSTRUCTIONS

REPLACING PARTS

5.VERMICULITE PANELS

5.1TAKE CARE WHEN HANDLING THE VERMICULITE PANELS, THEY ARE FRAGILE.

Note: Make sure you support the back panel before removing the second side panel in case the back falls forward

Undo the clips at the top of the side panels While supporting the rear panel:

Remove each side panel and place to one side

Remove the back panel

5

AR2138

• Remove the front lower panels

5.2• Reassemble in reverse order, ensuring the bottom edge of the back panel is behind the Air Baffle, Diagram 6

6

AR2139

Replace the side panels

6.maIN BURNER

6.1To replace the main burner:

Remove the logs and embers from the burner

Undo the four screws holding the burner tray in place

Lift the left side of the burner up and out first, Diagram 7

7

AR2117

6.2To replace the burner:

Lower the right-hand side over the injector

Lower the left side down

Insert the four fixing screws and tighten

NOTE: Before replacing the burner, make sure the silicone seal around the injector is intact.

7.maIN CONTROL ASSEMBLY

7.1To access the main control assembly, first remove:

the decorative frame if applicable

the door

vermiculite panels

main burner

air baffle

7.2To remove the access panel:

Undo the two screws, Diagram 8

8

AR2129

7.3Isolate the gas supply at the isolation device and disconnect the gas inlet, Diagram 9.

• Undo the 13 screws fixing the control unit in place

32

Image 32
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECGAS CHECK FLUE CHECKFail MAN Mode Increasing TemperatureDecreasing Temperature GeneralTemp Mode Timer ModeLOW Battery Setting the TimeAll models Cleaning the StudioChanging the Studio Batteries Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightTechnical Specification Covering the Following ModelsStudio 22 BF 8704BFLEC P8704BFLEC CATPacking Checklist Qty Description Fixing Kit containingBauhaus Frame Dimensions Size mm Steel Frame Dimensions Size mmProfil Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Rear ExitTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplyAppliance Location Installation of the appliance InstallationSafety Precautions AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly Wall Thickness MIN MAXTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Requirements CheckIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameMaIN Burner MaIN Control AssemblyVermiculite Panels Electrode Pilot Unit AssemblyPilot Burner Bracket Ignition Lead GAS ValvePilot Injector ThermocoupleMagnetic safety valve Control BOXMain injector Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component1ST Service 3RD Service5TH Service 7TH ServiceMember of the Stovax Group