Stovax Studio 22 manual Pressure and Leak Testing the Appliance, Follow , Main Control Assembly

Page 36

SERVICING INSTRUCTIONS

REPLACING PARTS

16.PRESSURE AND LEAK TESTING THE APPLIANCE

16.1Follow Section 7, Main Control Assembly:

• Access to the pressure test point can now be reached,

Diagram 19

19

AR2130

16.2To leak test any gas joints on the appliance, the control assembly must first be undone and tilted backwards, see Section 7, 7.3 Diagram 11

16.3Because there is now no burner fitted to perform a leak test, place a manometer tube over the injector tip.

Light the appliance and spray any joints with leak detector fluid

Tighten joints or replace as required

36

Image 36
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECFLUE CHECK FailGAS CHECK MAN Mode Increasing TemperatureDecreasing Temperature GeneralTemp Mode Timer ModeLOW Battery Setting the TimeCleaning the Studio Changing the Studio BatteriesAll models Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightTechnical Specification Covering the Following ModelsStudio 22 BF 8704BFLEC P8704BFLEC CATPacking Checklist Qty Description Fixing Kit containingSteel Frame Dimensions Size mm Profil Frame Dimensions Size mmBauhaus Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Rear ExitTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplyAppliance Location Installation Safety PrecautionsInstallation of the appliance AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly Wall Thickness MIN MAXTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Requirements CheckIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameMaIN Control Assembly Vermiculite PanelsMaIN Burner Pilot Unit Assembly Pilot Burner BracketElectrode Ignition Lead GAS ValvePilot Injector ThermocoupleMagnetic safety valve Control BOXMain injector Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component1ST Service 3RD Service5TH Service 7TH ServiceMember of the Stovax Group