Page 20

INSTALLATION INSTRUCTIONS

INSTALLATION

15

AR2134

Put vertical studwork at minimum clearance to the side of the fire (50mm)

• Secure to the vertical studwork through the holes in the metal brackets fitted to the fire, Diagram 16

The kit has been designed so that non-combustible board can be taken right up to the edge of the four brackets, Diagram 17

16

AR2133

17

Build the studwork chimney breast to the desired size:

Ensure all clearances to combustible material are maintained, Section 3, 3.1 above

Decide on flue requirements

Cut a hole for the flue exit - see Installation

Instructions, Flue Assembly

18

AR1902

Fit non-combustible board to the studwork above and to the sides of the fire. This should extend a minimum of 400mm above the appliance and a minimum of 50 mm to each side

Fit plasterboard to the remaining chimney breast front

Connect the flue system and gas services using the opening in the side of the chimney breast for access

After commissioning, finish the sides of the chimney breast, Diagram 19

19

A

Detail A

AR1911

•Apply a plaster finish to the chimney breast

AR2085

20

Image 20
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECGAS CHECK FLUE CHECKFail MAN Mode Increasing TemperatureDecreasing Temperature GeneralTemp Mode Timer ModeLOW Battery Setting the TimeAll models Cleaning the StudioChanging the Studio Batteries Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightTechnical Specification Covering the Following ModelsStudio 22 BF 8704BFLEC P8704BFLEC CATPacking Checklist Qty Description Fixing Kit containingBauhaus Frame Dimensions Size mm Steel Frame Dimensions Size mmProfil Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Rear ExitTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplyAppliance Location Installation of the appliance InstallationSafety Precautions AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly Wall Thickness MIN MAXTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Requirements CheckIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameMaIN Burner MaIN Control AssemblyVermiculite Panels Electrode Pilot Unit AssemblyPilot Burner Bracket Ignition Lead GAS ValvePilot Injector ThermocoupleMagnetic safety valve Control BOXMain injector Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component1ST Service 3RD Service5TH Service 7TH ServiceMember of the Stovax Group