Stovax Studio 22 manual Flue Assembly

Page 22

INSTALLATION INSTRUCTIONS

INSTALLATION

Fit non-combustible board to the studwork above the fire. This should extend a minimum of 400mm above the appliance and a minimum of 50mm to each side

Fit plasterboard to the remaining chimney breast front

Connect the flue system and gas services using the opening in the side of the chimney breast for access.

After commissioning, finish the sides of the chimney breast, Diagram 24

24

A

Detail A

AR1911

The top of the chimney breast must have a minimum 200cm2 vent.

• Apply a plaster finish to the chimney breast

7.all types of installation into stud work - wall box & batteries

Decide on the position for the wall box containing the batteries and wall switch

• Connect the wire from the fire to the battery pack,

Diagram 25

25

AR1920

Connect the wire from the fire to the touch pad/ connector, Diagram 26

26

AR1919

Correctly position the four new AA size batteries

Re-assemble the battery holder as shown in Diagram 27

Ensure the touch pad cable is tucked to the left on fitting the wall plate back onto the wall

27

AR1932

Secure the wall plate with the touch pad attached to the wall box, Diagram 28

28

wall plate

AR1887

PLEASE ENSURE NO WIRES ARE TRAPPED BEFORE REPLACING THE WALL PLATE. THE TOUCH PAD LEAD IS EASILY DAMAGED.

8. FLUE ASSEMBLY

Three types of flue terminal are available: rear flue, horizontal and vertical.

NOTE: When switching from top to rear exit it is important that you use the spigot supplied with the Rear Flue Kit.

22

Image 22
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECFail FLUE CHECKGAS CHECK Decreasing Temperature MAN ModeIncreasing Temperature GeneralLOW Battery Temp ModeTimer Mode Setting the TimeChanging the Studio Batteries Cleaning the StudioAll models Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightStudio 22 BF 8704BFLEC P8704BFLEC Technical SpecificationCovering the Following Models CATPacking Checklist Qty Description Fixing Kit containingProfil Frame Dimensions Size mm Steel Frame Dimensions Size mmBauhaus Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsTOP Exits Flue OptionsRear Exit TOP Flue UP & OUT KITExtra Flue Lengths TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN GAS SupplyAppliance Location Safety Precautions InstallationInstallation of the appliance AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly TOP Exit Vertical & Horizontal Flue Wall Thickness MINMAX TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing Requirements Servicing / Fault Finding ChartsSymptom Cause Remedy CheckIgnition Functional Check Flame Failure Functional CheckGeneral Replacing PartsWindow Frame Assembly Decorative FrameVermiculite Panels MaIN Control AssemblyMaIN Burner Pilot Burner Bracket Pilot Unit AssemblyElectrode Pilot Injector Ignition LeadGAS Valve ThermocoupleMain injector Magnetic safety valveControl BOX Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component5TH Service 1ST Service3RD Service 7TH ServiceMember of the Stovax Group