COMMISSIONING

1.COMMISSIONING

1.1Complete the Commissioning Checklist at the front of this manual covering:

Flue checks

Gas checks

For working pressure test, use the access panel at the gas connection ensuring the burner is in position, see

Installation, Section 9, 9.1

1.2In the unlikely event that the appliance is receiving interference from other electronic devices, re-programme the handset/Control box

Reprogramming handset/Control box

Remove the battery cover from the handset to see the four DIP switches. See Diagram 1

1

AR1935

Each of the four switches can be set to either one of two positions, in any combination.

To re-code the handset:

Change the combination of how the DIP switches are set.

For example see Diagram 2:

2

AR1936

Once the handset has a new code, the control box needs to be reprogrammed:

To access the control box, see Servicing Instructions, Section 7 - Main Control Assembly.

Press and hold the reset button on the control box until you hear two signals. After the second longer signal:

Release the reset button and within 20 seconds:

-Press the DOWN button on the handset until your

hear an additional long signal confirming the new code

28

Image 28
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECFail FLUE CHECKGAS CHECK MAN Mode Increasing TemperatureDecreasing Temperature GeneralTemp Mode Timer ModeLOW Battery Setting the TimeChanging the Studio Batteries Cleaning the StudioAll models Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightTechnical Specification Covering the Following ModelsStudio 22 BF 8704BFLEC P8704BFLEC CATPacking Checklist Qty Description Fixing Kit containingProfil Frame Dimensions Size mm Steel Frame Dimensions Size mmBauhaus Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Rear ExitTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplyAppliance Location Safety Precautions InstallationInstallation of the appliance AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly Wall Thickness MIN MAXTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Requirements CheckIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameVermiculite Panels MaIN Control AssemblyMaIN Burner Pilot Burner Bracket Pilot Unit AssemblyElectrode Ignition Lead GAS ValvePilot Injector ThermocoupleMagnetic safety valve Control BOXMain injector Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component1ST Service 3RD Service5TH Service 7TH ServiceMember of the Stovax Group