Stovax Studio 22 manual Appliance Location

Page 15

INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

5.APPLIANCE LOCATION

5.1Please note this appliance has been specifically designed for studwork applications although installation into other constructions, including masonry, is entirely feasible. There are two methods of installation, see Installation Instructions 3.2 Frame, 3.3 Edge

5.2This appliance must stand on a non-combustible hearth/ platform that is at least 12mm thick.

NOTE: It is recommended you construct the back panel of the fireplace from natural materials cut into three or more sections to prevent cracking. Resin-based materials may not be suitable. This appliance is an effective heat producer and attention must be paid to the construction and finish of the fireplace.

5.3A combustible shelf must be:

maximum 150mm in depth

minimum, 400mm high above the fire

A combustible side wall must be a minimum of 150mm from the appliance.

5

AR2077

15

Image 15
Contents Studio Studio 22 Balanced flue 8704BFLEC P8704BFLEC Covering the Following ModelFLUE CHECK FailGAS CHECK General MAN ModeIncreasing Temperature Decreasing TemperatureSetting the Time Temp ModeTimer Mode LOW BatteryCleaning the Studio Changing the Studio BatteriesAll models Arrangement of Fuel BED Advice on Handling and Disposal of Fire CeramicsFire will not Light HOT SURFACESCAT Technical SpecificationCovering the Following Models Studio 22 BF 8704BFLEC P8704BFLECQty Description Fixing Kit containing Packing ChecklistSteel Frame Dimensions Size mm Profil Frame Dimensions Size mmBauhaus Frame Dimensions Size mm Flue and Chimney Requirements SITE REQUIREMENTSTOP Flue UP & OUT KIT Flue OptionsRear Exit TOP ExitsGAS Supply TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN Extra Flue LengthsAppliance Location Installation Safety PrecautionsInstallation of the appliance AR2117 Distance to Combustible Material Stud Work InstallationSlips Flue system see Installation, Flue AssemblyApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly TOP Exit Vertical Including Offset Wall Thickness MINMAX TOP Exit Vertical & Horizontal FlueAdd 10 mm to the outlet end Assembling the ApplianceArrangement of Fuel BED AR02123 Lighting the Studio Thermostatic Remote ControlCommissioning CommissioningCheck Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing RequirementsFlame Failure Functional Check Ignition Functional CheckDecorative Frame Replacing PartsWindow Frame Assembly GeneralMaIN Control Assembly Vermiculite PanelsMaIN Burner Pilot Unit Assembly Pilot Burner BracketElectrode Thermocouple Ignition LeadGAS Valve Pilot InjectorPrimary Aeration Plate Magnetic safety valveControl BOX Main injectorFollow , Main Control Assembly Pressure and Leak Testing the ApplianceComponent Short Spares List Studio7TH Service 1ST Service3RD Service 5TH ServiceMember of the Stovax Group