Stovax Studio 22 manual Cleaning the Studio, Changing the Studio Batteries, All models

Page 6

USER INSTRUCTIONS

EMERGENCY SHUT OFF

If the batteries fail during use of the fire, move the switch to the OFF (O) position, Diagram 3

(This switch is set to be ON during normal operation and must remain ON)

3

AR1933

3.CLEANING the STUDIO

3.1Make sure the fire and surrounds are cool before cleaning. Use:

A damp cloth for the painted frame

Use soap and water to clean the glass

3.2Opening the Glass Door

3.2.1 Steel Frame only

[If fitted with a Steel Frame, this needs to be removed first:

Lift the frame upwards off its four support brackets,

Diagram 4

4

AR2136

3.3All models

Using the allen key provided to release the upper and lower catches on the right side of the door:

Slide the allen key into the gap between the door and frame and locate the catch of the upper lock

Push the allen key DOWN

Slide the allen key into the gap and locate the lower lock

Push the allen key UP

5

AR2119

AR2119

• Open the door outwards

When closing the door ensure the door catches are fully engaged.

4. CHANGING THE STUDIO BATTERIES

The appliance batteries are located behind the wall switch plate.

Undo the two screws securing the wall switch and plate and remove, Diagram 6

6

AR1887

Correctly position the four new AA size batteries

Re-assemble the battery holder as shown in Diagram 7

Ensure the touch pad cable is tucked to the left on fitting the wall plate back onto the wall, Diagram 7

PLEASE ENSURE NO WIRES ARE TRAPPED BEFORE REPLACING THE WALL PLATE. THE TOUCH PAD LEAD IS EASILY DAMAGED.

6

Image 6
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECFLUE CHECK FailGAS CHECK Decreasing Temperature MAN ModeIncreasing Temperature GeneralLOW Battery Temp ModeTimer Mode Setting the TimeCleaning the Studio Changing the Studio BatteriesAll models Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightStudio 22 BF 8704BFLEC P8704BFLEC Technical SpecificationCovering the Following Models CATPacking Checklist Qty Description Fixing Kit containingSteel Frame Dimensions Size mm Profil Frame Dimensions Size mmBauhaus Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsTOP Exits Flue OptionsRear Exit TOP Flue UP & OUT KITExtra Flue Lengths TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN GAS SupplyAppliance Location Installation Safety PrecautionsInstallation of the appliance AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly TOP Exit Vertical & Horizontal Flue Wall Thickness MINMAX TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing Requirements Servicing / Fault Finding ChartsSymptom Cause Remedy CheckIgnition Functional Check Flame Failure Functional CheckGeneral Replacing PartsWindow Frame Assembly Decorative FrameMaIN Control Assembly Vermiculite PanelsMaIN Burner Pilot Unit Assembly Pilot Burner BracketElectrode Pilot Injector Ignition LeadGAS Valve ThermocoupleMain injector Magnetic safety valveControl BOX Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component5TH Service 1ST Service3RD Service 7TH ServiceMember of the Stovax Group