Stovax Studio 22 manual Assembling the Appliance, Add 10 mm to the outlet end

Page 24

INSTALLATION INSTRUCTIONS

INSTALLATION

8.2.2 The appliance is factory set for top exit.

8.3A 152mm (6") diameter hole in the wall or ceiling is required to install the flue. This can be achieved by either:

a)Core drill

b)Hammer and chisel

Drill small holes around the circumference when using method b. Make good both ends of the hole.

8.4• Allow enough room either above or to the side of the appliance to assemble the flue on top

Assemble a horizontal flue in the following order:

-Vertical section

-90° elbow

-Horizontal plus terminal

Support the opening of a masonry installation with a lintel

8.5Only the horizontal terminal section can be reduced in size.

To find the length:

Measure from the outside of the wall to the stop on the

90°

Add 10 mm to the outlet end

• Measure from the edge of the slots closest to the wall

• Mark around the flue, Diagram 31

31

10mm

AR0629

A wall plate is supplied to fix the flue to the wall:

Bend the tab to 90°

Assemble the plate onto the flue but wait to secure to wall and flue after the flue is fully assembled, Diagram 31

8.6The cardboard fitment in the terminal is used to support the flue whilst it is cut to length. ONCE CUT TO SIZE, REMOVE THE CARDBOARD REMNANT, Diagram 32.

32

AR0630

9. ASSEMBLING THE APPLIANCE

There are two possible points of entry for your gas pipe depending on the location of your appliance, one located on the underside and the other located on the left-hand side:

Choose the most suitable for your installation

Slit with a sharp knife before bringing through the supply pipe, Diagram 33

9.1• Remove the compression elbow from the appliance and connect it to the gas supply pipe

As the appliance is fitted into the enclosure:

Pass the elbow and supply pipe through the silicone panel

PURGE THE SUPPLY PIPE. This is essential to expel any debris that may block the gas controls.

Connect the elbow to the appliance inlet pipe, Diagram

33

33

AR1888

9.2To reassemble the control unit:

Put the left-hand side of the control unit into the left corner of the interior, before lowering down and sliding to the right

Refix with the 13 screws

Connect the elbow to the appliance inlet pipe, Diagram

33

24

Image 24
Contents Studio Covering the Following Model Studio 22 Balanced flue 8704BFLEC P8704BFLECFLUE CHECK FailGAS CHECK MAN Mode Increasing TemperatureDecreasing Temperature GeneralTemp Mode Timer ModeLOW Battery Setting the TimeCleaning the Studio Changing the Studio BatteriesAll models Advice on Handling and Disposal of Fire Ceramics Arrangement of Fuel BEDHOT SURFACES Fire will not LightTechnical Specification Covering the Following ModelsStudio 22 BF 8704BFLEC P8704BFLEC CATPacking Checklist Qty Description Fixing Kit containingSteel Frame Dimensions Size mm Profil Frame Dimensions Size mmBauhaus Frame Dimensions Size mm SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Rear ExitTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplyAppliance Location Installation Safety PrecautionsInstallation of the appliance AR2117 Stud Work Installation Distance to Combustible MaterialFlue system see Installation, Flue Assembly SlipsApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly Wall Thickness MIN MAXTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAssembling the Appliance Add 10 mm to the outlet endArrangement of Fuel BED AR02123 Thermostatic Remote Control Lighting the StudioCommissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Requirements CheckIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameMaIN Control Assembly Vermiculite PanelsMaIN Burner Pilot Unit Assembly Pilot Burner BracketElectrode Ignition Lead GAS ValvePilot Injector ThermocoupleMagnetic safety valve Control BOXMain injector Primary Aeration PlatePressure and Leak Testing the Appliance Follow , Main Control AssemblyShort Spares List Studio Component1ST Service 3RD Service5TH Service 7TH ServiceMember of the Stovax Group