Stovax Studio 22 manual AR2117

Page 17

INSTALLATION INSTRUCTIONS

INSTALLATION

2.5You can now remove the burner:

Undo the four screws holding the burner tray in place

Remove the burner

Lift the left-hand side up and out

4

AR2117

2.6• Undo the two screws in the rear air baffle to remove it,

Diagram 5, arrow A

5

A

 

 

A

B

AR2116

 

• Remove the two screws holding the access panel in place, Diagram 5, arrow B

2.7• Undo the 13 screws fixing the control unit in place

6

With all screws removed:

Slide the control unit to the left to clear the injector and pilot pipework at the right side

Lift the right-hand side up and out

7

AR2128

AR2135

17

Image 17
Contents Studio Studio 22 Balanced flue 8704BFLEC P8704BFLEC Covering the Following ModelGAS CHECK FLUE CHECKFail Increasing Temperature MAN ModeDecreasing Temperature GeneralTimer Mode Temp ModeLOW Battery Setting the TimeAll models Cleaning the StudioChanging the Studio Batteries Arrangement of Fuel BED Advice on Handling and Disposal of Fire CeramicsFire will not Light HOT SURFACESCovering the Following Models Technical SpecificationStudio 22 BF 8704BFLEC P8704BFLEC CATQty Description Fixing Kit containing Packing ChecklistBauhaus Frame Dimensions Size mm Steel Frame Dimensions Size mmProfil Frame Dimensions Size mm Flue and Chimney Requirements SITE REQUIREMENTSRear Exit Flue OptionsTOP Exits TOP Flue UP & OUT KITTOP Flue Vertical Offset KIT 8530/8530AN TOP Flue Vertical KIT 8524/8524ANExtra Flue Lengths GAS SupplyAppliance Location Installation of the appliance InstallationSafety Precautions AR2117 Distance to Combustible Material Stud Work InstallationSlips Flue system see Installation, Flue AssemblyApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly MAX Wall Thickness MINTOP Exit Vertical & Horizontal Flue TOP Exit Vertical Including OffsetAdd 10 mm to the outlet end Assembling the ApplianceArrangement of Fuel BED AR02123 Lighting the Studio Thermostatic Remote ControlCommissioning CommissioningSymptom Cause Remedy Servicing / Fault Finding ChartsServicing Requirements CheckFlame Failure Functional Check Ignition Functional CheckWindow Frame Assembly Replacing PartsGeneral Decorative FrameMaIN Burner MaIN Control AssemblyVermiculite Panels Electrode Pilot Unit AssemblyPilot Burner Bracket GAS Valve Ignition LeadPilot Injector ThermocoupleControl BOX Magnetic safety valveMain injector Primary Aeration PlateFollow , Main Control Assembly Pressure and Leak Testing the ApplianceComponent Short Spares List Studio3RD Service 1ST Service5TH Service 7TH ServiceMember of the Stovax Group