Stovax Studio 22 manual Lighting the Studio, Thermostatic Remote Control

Page 27

INSTALLATION INSTRUCTIONS

INSTALLATION

11. LIGHTING THE STUDIO

Note: The Emergency Shut Off switch must be in the ON position, refer to Section 2, User Instructions.

There are two ways of lighting the Studio:

by thermostatic remote control

using the fire’s touch pad

THERMOSTATIC REMOTE CONTROL

43

AR1883

To light the appliance using the handset:

Press OFF and UP buttons simultaneously

You hear a beep as the ignition process begins.

TOUCH PAD CONTROL

44

Press the ON-OFF button to light the appliance, (up to

30 seconds)

Press the UP button to increase the flame height.

Press the DOWN button to decrease the flame height. At the lowest point it goes to ‘standby mode’, (only pilot

lit)

Press the ON-OFF button to turn the appliance off.

27

Image 27
Contents Studio Studio 22 Balanced flue 8704BFLEC P8704BFLEC Covering the Following ModelFLUE CHECK FailGAS CHECK General MAN ModeIncreasing Temperature Decreasing TemperatureSetting the Time Temp ModeTimer Mode LOW BatteryCleaning the Studio Changing the Studio BatteriesAll models Arrangement of Fuel BED Advice on Handling and Disposal of Fire CeramicsFire will not Light HOT SURFACESCAT Technical SpecificationCovering the Following Models Studio 22 BF 8704BFLEC P8704BFLECQty Description Fixing Kit containing Packing ChecklistSteel Frame Dimensions Size mm Profil Frame Dimensions Size mmBauhaus Frame Dimensions Size mm Flue and Chimney Requirements SITE REQUIREMENTSTOP Flue UP & OUT KIT Flue OptionsRear Exit TOP ExitsGAS Supply TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN Extra Flue LengthsAppliance Location Installation Safety PrecautionsInstallation of the appliance AR2117 Distance to Combustible Material Stud Work InstallationSlips Flue system see Installation, Flue AssemblyApply a plaster finish to the chimney breast Studwork for Cool Wall Installation KIT Flue Assembly TOP Exit Vertical Including Offset Wall Thickness MINMAX TOP Exit Vertical & Horizontal FlueAdd 10 mm to the outlet end Assembling the ApplianceArrangement of Fuel BED AR02123 Lighting the Studio Thermostatic Remote ControlCommissioning CommissioningCheck Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing RequirementsFlame Failure Functional Check Ignition Functional CheckDecorative Frame Replacing PartsWindow Frame Assembly GeneralMaIN Control Assembly Vermiculite PanelsMaIN Burner Pilot Unit Assembly Pilot Burner BracketElectrode Thermocouple Ignition LeadGAS Valve Pilot InjectorPrimary Aeration Plate Magnetic safety valveControl BOX Main injectorFollow , Main Control Assembly Pressure and Leak Testing the ApplianceComponent Short Spares List Studio7TH Service 1ST Service3RD Service 5TH ServiceMember of the Stovax Group