FLEX VENT INSTALLATION

3.Do not allow the flexible vent to bend in radius tighter than 5" (127mm). Refer to Figure 2.

4.Horizontal runs of flexible vent shall be supported at maximum 2 foot intervals; vertical runs, five feet intervals. Metal strapping, properly secured, is an acceptable means to support the flexible vent.

5.Flexible vent spacers are to be installed at intervals prescribed by the flexible vent manufacture; and in such a way as to maintain concentric inner and outer vent spacing.

D.Attaching flexible venting to vertical termination assemblies.

1.When using Simpson pipe, a MHS flex-to-pipe adaptor and/or rigid pipe section(s) is required to connect the flexible vent assembly to the vertical termination by using three self penetrating screws.

2.Review Figure 4 and corresponding instructions for proper overlap, clamp and screw placement.

3.Three each self penetrating screws are drilled opposite one another and below the gear clamp.

4.Use only listed and approved terminations and accessories, installed per the installation instructions and Figure 3.

E.Installing flexible venting to horizontal termination assemblies.

1.Connect the 4" flexible vent to the horizontal termination as in Figure 5.

2.Slide termination cap adapter ring over the termination cap’s outside pipe and secure with three screws.

3.Connect the 7" flexible vent to the termination adapter ring as in Figure 5.

4.Review Figure 5 for proper overlap and clamp placement

5.Three each self penetrating screws are drilled opposite one another and below the gear clamp.

6.Use only listed and approved terminations and accessories, installed per the termination instructions and Figure 5.

 

Termination

 

 

Rigid pipe

 

 

 

length

 

cap

 

 

 

 

 

Flex to pipe

Flashing

 

 

 

Storm collar

Securing

 

adapter

 

 

 

 

screws

 

(FPA/8)

 

 

(3 places

Gear

1¾ in. flexible pipe

Rigid pipe

Roof support

equidistant

clamp

and adapter outer

just above

 

collar overlap

length

 

gear clamp)

 

 

Flex to pipe

 

 

 

Gear clamp

adapter

 

 

 

 

 

 

UL1777

(FPA/8)

 

 

 

 

 

 

 

Flex vent

 

 

Figure 4 — Typical pipe connection

UL1777 flex pipe

 

 

Monessen horizontal

 

 

 

Fire stop

 

 

vent termination

DVFA/8 Adapter

 

Termination to flex

 

 

Securing screws

adapter (FTA7/8)

 

 

 

 

 

(three places

 

 

 

equidistant, just

 

 

 

above gear clamp)

 

 

 

UL1777

Gear

1¾ in. flexible pipe

 

Flex vent

and termination outer

 

 

clamps

collar overlap

Figure 3 —

 

Figure 5 —

 

Typical vertical flex vent installation

Typical horizontal flex vent installation

54D5031

27

Image 27
Contents What to do if YOU Smell GAS ModelsContents Important Safety Information InstallerOwner Wellhead gas Never connect unit to privateNon-utility gas wells. This Gas is commonly known asListed Vented GAS Fireplace Heater Product Features and Code ApprovalProduct Specifications Code ApprovalBefore YOU Start PRE-INSTALLATION InformationHigh Elevations Orifice SIZES, Pressures and BTUsFireplace Framing Framing DimensionsFireplace Dimensions Fireplace DimensionsLocating Gas Fireplace Fireplace LocationClearances Clearances to CombustiblesMantel Clearances Securing Fireplace to Floor or Framing Insulation BoardInstallation Information Installation PrecautionsFinishing Material Combustible Clearances for Vent Pipe Vent InstallationShould be concentric within the 65/8 Optional TOP Vent ApplicationAfter conversion to top vent Configuration the 4 100mm flue pipeFor Vertical Termination Installation PlanningInstalling a Vent System in AN Outside Chase For Horizontal TerminationMinimum Distances Horizontal Vent Termination LocationFeet HOW to USE the Vent GraphRear Through the Wall Applications Venting Installationfire hazard Rear Wall Vent InstallationDo not recess vent termination Into any wall. This will cause aMaximum Three 3 90 Elbows Per Installation Horizontal Termination ConfigurationsHorizontal Run Reduction Horizontal Termination ConfigurationBelow Grade Installation Below Grade InstallationsSupport Straps for Horizontal Runs Vertical THROUGH-THE-ROOF ApplicationsFlat Ceiling Installation Installation for Vertical TerminationMinimum chimney clearance Start the flexible vent as follows Flex Vent InstallationTypical pipe connection Fireplace Installation Installing GAS Piping to Fireplace / Burner System LocationCheck GAS Type Gas Connection Do not use open flame to check Checking GAS Pressure and Electrical InstallationOptional DC Remote Systems Electrical InstallationRemote Wall Mounted Switch Remote Wall SwitchGlass Removal & Brick Installation Brick InstallationGlass Frame Removal Placement of Lava ROCK, Rock Wool and Logs Final InstallationLog #3 Log #2 Placement of Log 7 HBDV400 only Installing Universal AndironsInitial Lighting Leak TestingOperating Instructions Millivolt What to do if YOU Smell GASApproved Leak Testing Method Main Burner Switch Lighting the BurnerPilot Position Burner Cleaning and MaintenanceBURNER, Pilot and Control Compartment Pilot FlameRock Wool Vent SystemGlass Door LogsStanding Pilot Ignition Symptom Possible Cause ActionTroubleshooting Fireplace Components Replacement PartsCC=Cottage Clay CR=Cottage Red Millivolt Engine Vent Components Millivolt ComponentsRefer to illustrations on previous Vent ComponentsLogs Special Requirements Special Requirements 54D5031 54D5031 54D5031 Lifetime Warranty Five Year WarrantyBasic Warranty