Trane RT-SVX10C-EN specifications Table of Contents

Page 3

Section One

 

About The Manual

2

Literature Change History

2

Overview of Manual

2

Section Two

 

General Information

4

Model Number Description

4

Hazard Identification

6

Commonly Used Acronyms

6

Unit Description

6

Input Devices & System Functions

8

Constant Volume & Variable Air Volume Units

8

Constant Volume (CV) Units

10

Variable Air Volume (VAV) Units

11

Space Temperature Averaging

12

Unit Control Modules (UCM)

12

Section Three

 

Installation

14

Unit Inspection

14

Storage

14

Unit Clearances

14

Unit Dimensions & Weight Information

14

Roof Curb and Ductwork

22

Pitch Pocket Location

23

Unit Rigging & Placement

23

General Unit Requirements

25

Main Electrical Power Requirements

25

Field Installed Control Wiring

25

Requirements for Electric Heat Units

25

Requirements for Gas Heat

25

Requirements for Hot Water Heat (SLH_)

25

Requirements for Steam Heat (SSH_)

26

O/A Pressure Sensor and Tubing Installation

26

Condensate Drain Connection

27

Shipping Fasteners

27

O/A Sensor & Tubing Installation

31

Units with Statitrac™;

31

Gas Heat Units (SFH_)

32

Connecting the Gas Supply Line to the Furnace

 

Gas Train

32

Flue Assembly Installation

34

Hot Water Heat Units (SLH_)

34

Steam Heat Units (SSH_)

35

Disconnect Switch External Handle

38

Electric Heat Units (SEH_)

38

Main Unit Power Wiring

38

Disconnect Switch Sizing (DSS)

44

Field Installed Control Wiring

45

Controls using 24 VAC

45

Controls using DC Analog Input/Outputs

45

Constant Volume System Controls

45

Variable Air Volume System Controls

46

Constant Volume or Variable Air Volume System

 

Controls

46

Table of Contents

 

Section Four

 

Unit Start-Up

55

Cooling Sequence of Operation

55

Gas Heating Sequence of Operation

56

Fenwal Ignition System

56

Honeywell Ignition System

56

Modulating Gas Sequence of Operation

57

Flame Failure

57

Electric Heat Sequence of Operation

58

Wet Heat Sequence of Operation

58

Electrical Phasing

59

Voltage Supply and Voltage Imbalance

60

Service Test Guide for Component Operation

61

Verifying Proper Fan Rotation

63

If all of the fans are rotating backwards;

63

System Airflow Measurements

63

Constant Volume Systems

63

Variable Air Volume Systems

65

Exhaust Airflow Measurement

66

TraqTM Sensor Airflow Measurement

66

Economizer Damper Adjustment

80

Compressor Start-Up

82

Compressor Operational Sounds

83

Thermostatic Expansion Valves

93

Charging by Subcooling

93

Low Ambient Dampers

93

Electric, Steam and Hot Water Start-Up

94

Gas Furnace Start-Up

94

Two Stage Gas Furnace

95

Full Modulating Gas Furnace

97

Limited Modulating Gas Furnace

98

Final Unit Checkout

99

Section Five

 

Service & Maintenance

100

Fan Belt Adjustment

104

Scroll Compressor Replacement

105

VFD Programming Parameters

106

Monthly Maintenance

107

Filters

107

Cooling Season

107

Heating Season

108

Coil Cleaning

108

Final Process

109

Index

111

Warranty

114

3

Image 3
Contents Models Later Design SequenceWith 3-DTMScroll Compressors Overview of Manual Literature Change HistoryTable of Contents Model Number Description General InformationDigit 3 Unit Airflow Unit Description Fiberglass WoolHazard Identification General Information Commonly Used AcronymsSupply AIR General InformationCFM Ventilation Control Module VCM Design special option onlyLead-Lag Constant Volume CV Units Unit Component Layout and Shipwith Locations Variable Air Volume VAV UnitsGeneral Information Space Temperature Averaging Control Module Locations for SHF 40, 60, 70 & 75 Ton Units Table of Contents Storage Unit Dimensions & Weight InformationNo Step Surface Unit Inspection As soon as the unit arrives at the job sitePage Sahf Cooling-Only Units 20 thru 75 Ton Electrical Entrance Data Unit Dimensions InstallationUnit Dimensional Data Dimensions Size Unit Base Dimensional Data DimensionsSEHF, SFHF, SLHF, SSHF, Sxhf Units 20 thru 75 Ton Unit Size Furnace Dimensions Note Size/MBH Length Height Unit Base Dimensional Data Dimensions SizeUnit Dimensions Size Electrical Entrance Data Unit Dimensions SizeSHG Cooling & Heating Units 90 through 130 Ton Sshf SahfSehf SlhfRoof Curb and Ductwork SE,SLSahf Sshf Sfhf Sxhf Sehg Sfhg Sxhg HF/G Pitch Pocket Location Installation Unit Rigging & PlacementIf a Trane Curb Accessory Kit is not used Heavy ObjectsTypical Unit Rigging Unit Base & Roof Curb Section Requirements for Electric Heat Units Main Electrical Power RequirementsInstallation Field Installed Control Wiring General Unit RequirementsInstallation Condensate Drain Connections Page Removing Supply and Exhaust Fan Shipping Channels Motors 5Hp Page Units with StatitracTM Installation Sensor & Tubing InstallationConnecting the Gas Supply Line to the Furnace Gas Train Hazardous Gases and Flammable VaporsGas Heat Units SFH 350 MBH 850 MBH Hot Water Heat Units SLH Flue Assembly InstallationFlue Assembly 1000 MBH Modulating 500 MBH 1000 MBHSSHG-90 Steam Heat Units SSHThrough 130 Ton units Page Hazardous Voltage Live Electrical ComponentsUse Copper Conductors Only Typical Field Power Wiring 20 thru 75 Ton Page FLA Supply Fan Motor FLA ea HorsepowerCondenser Fans Total FLA Exhaust Fan MotorCombustion Blower Motor Sfhf OnlyUnit Tonnage No. of Compressors Tonnage Type Designation On the Next Single Source Power 380V, 415V, 460V,Load Definitions Load = Current of the Largest Motor Compressor or FAN MotorMCA = 1.25 x Load MOP = 1.25 x Load Power Wire Sizing and Protection Device EquationsDisconnect Switch Sizing DSS Dual Source Power units 200VControls using 24 VAC Installation Controls using DC Analog Input/OutputsConstant Volume System Controls Constant Volume or Variable Air Volume System Controls Variable Air Volume System ControlsDepressurize PressurizeFire Purge16A Refer to Wiring Notes on16B Page 17A 17B Input Voltage VAV SetpointTable of Contents Sequence of Operation Cooling Sequence of OperationPropane Gas Gas Heating Sequence of OperationFenwal Ignition System Unit Start-UpModulating Gas Sequence of Operation Flame FailureFull and Limited Modulating Gas Furnace Electric Heat Sequence of Operation Unit Start-Up Wet Heat Sequence of OperationFreeze Protection Unit Power Compressor DamageElectrical Phasing Voltage Supply and Voltage Imbalance Voltage SupplyVoltage Imbalance IGV Service Test Guide for Component OperationSupply FAN If all of the fans are rotating backwards System Airflow Measurements Constant Volume SystemsRotating Components Verifying Proper Fan RotationCondenser Fan Location with Human Interface Designator Variable Air Volume Systems Optional with all units equipped with an economizer Exhaust Airflow MeasurementTraqTM Sensor Airflow Measurement Optional with all UnitsTon Supply Fan Performance without Inlet Guide Vanes 20 & 25 Ton Supply Fan Performance without Inlet Guide VanesWocfm 1200 RPM 40 HP 40% 300 RP Standard Evaporator Coil 20000 30000 40000 50000 60000 Drop Ton Supply Fan Performance with Inlet Guide Vanes 20 & 25 Ton Supply Fan Performance with Inlet Guide Vanes15 HP 900 RPM 80% 10 HP RPM AIR Through 75 Ton Component Static Pressure Drops Inches W.CSTD AIRCFM RPM BHP HF-C30 000 HF-C20 000HF-C25 000 10,000AIR RPM BHP RPM BHP BHP RPM BHP RPM BHPFresh Air & Return Air Damper Operation Economizer Damper AdjustmentTo Adjust the Fresh Air Damper Travel Exhaust Air DampersTon Units Damper Travel Adjustment PositionConnecting Rod Crank Arm Hole Configuration70 & 105 Ton Fresh Air & Return Air Linkage AdjustmentCompressor Start-Up All SystemsAt Low Ambient Start-Up Compressor Operational SoundsRefrigerant Charging At ShutdownCompressor Locations Cooling Cycle Pressure Curve 340 320 Full Load 380 360 340 OD Ambient Full Load 380 360 340 OD Ambient 320 240 220 380 360 OD Ambient Thermostatic Expansion Valves Charging by SubcoolingLow Ambient Dampers Gas Furnace Start-Up Electric, Steam and Hot Water Start-UpTwo Stage Gas Furnace High-Fire AdjustmentCombustion Air Adjustment O2 Low-Fire Adjustment 500 MBH, 850 & 1,000 MBH onlyMBH Firing ManifoldCO2 Pressure Full Modulating Gas Furnace Heat ExchangerUnit control Limited Modulating Gas Furnace Unit Start-Up Modulating Gas RegulatorModulating Gas Regulator Legend Typical Gas Furnace Unit Start-Up Final Unit CheckoutService & Maintenance Unit Internal Fuse Replacement Data & VFD Factory Settings Service & MaintenanceModel Type Unit Model Box-type Note QtyQty Size of each Wet Heat Coil Fin Data Total Coil FinsService & Maintenance Fan Belt Adjustment Scroll Compressor Replacement Suction Line Filter/Drier InstallationGripbelts Gripnotch Cross Small P.D Section Range Min Max Hazardous Voltage! w/Capacitors VFD Programming ParametersSupply and Exhaust Fan VFD Programming Parameters Service & Maintenance Monthly Maintenance FiltersCooling Season Heating Season Coil CleaningCoil Cleaners Contains RefrigerantSteam or Hot Water Coils Final Process Index See Figure Gate type valve 36-37 See -12 Figure See VOM Contacts -16 Figure Equipment Damage From Ultraviolet UV Lights Warranty and Liability Clause115 116