5 Framing and Clearances
A. Select Appliance Location
When selecting a location for the appliance it is important to consider the required clearances to walls (see Figure 5.1).
WARNING! Risk of Fire or Burns! Provide adequate clearance around air openings and for service access. Due to high temperatures, the appliance should be located out of traffic and away from furniture and draperies.
NOTICE: Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY. Illustrations/diagrams are not drawn to scale. Actual installation may vary due to individual design preference.
(1772 mm)
(1772 mm)
1.5 in.
(114 mm)
1.5 in. (114 mm)
52 in.
(1321 mm)
(2505 mm)
1.5in.
(114 mm)
Top Vent
One 90° elbow
Horiz Term
1.5 in.
(114 mm)
31 in.
(787 mm)
1.5 in. (114 mm)
52 in.
(1321 mm) 12 in.
(305 mm)
In addition to these framing dimensions, also reference the following sections:
•Clearances
•Vent Clearances and Framing
Figure 5.1 Appliance Locations
B. Assemble Steel Stud Kit
You must assemble and install the steel stud kit and at- tach the noncombustible cement board (provided), The steel track and studs are precut to the correct lengths.
•Lay out steel track and studs per Figure 5.2.
•Fasten track and studs together with the
•Attach steel stud assembly to framing as shown in Figure 9.1.
2 tracks
4 Studs
16Screws (8 each side)
Assembled
Figure 5.2 Steel Track and Studs