Heat & Glo LifeStyle LUX60 owner manual Disassemble Vent Sections, Install Metal Roof Flashing

Page 37

D. Disassemble Vent Sections

Rotate either section (see Figure 10.9) so the seams on both pipe sections are aligned as shown in Figure 10.10.

Pull carefully to separate the pieces of pipe.

24 in. min.

(610 mm)

Termination

Cap

 

 

 

 

Horizontal

 

20 in.

 

 

overhang

 

 

 

 

 

 

 

 

 

 

(508 mm)

Vertical

Lowest

wall

Discharge

 

Opening

 

Figure 10.9 Rotate Seams for Disassembly

Figure 10.10 Align and Disassemble Vent Sections

E. Install Metal Roof Flashing

See minimum vent heights for various pitched roofs (Figure 10.11) to determine the length of pipe to extend through the roof.

Slide the roof flashing over the pipe sections extending through the roof as shown in Figure 10.12.

Storm Collar

X

12

 

Roof

 

Flashing

Roof Pitch

 

is X / 12

 

H (min.) - Minimum height

 

from roof to lowest

 

discharge opening.

Roof Pitch

H (Min.) Ft.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

 

1.0*

Over 11/12 to 12/12

4.0

Over 6/12 to 7/12

1.25*

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

Over 20/12 to 21/12

8.0

 

* 3 ft. minimum in snow regions

 

 

Figure 10.11 Minimum Height From Roof To Lowest Discharge Opening

NOTICE: Failure to properly caulk the roof flashing and pipe seams may permit entry of water.

Caulk the gap between the roof flashing and the outside diameter of the pipe.

Caulk the perimeter of the flashing where it contacts the roof surface. See Figure 10.15.

Caulk the overlap seam of any exposed pipe sections that are located above the roof line.

CAULK

Figure 10.12 Caulking

Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11

37

Image 37
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Reference Materials Limited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyDecorative Doors and Fronts Operation of the LUX60Matching Security Codes Before Lighting FireplaceSystem Operation IntelliFire Ignition System IPI Lighting Instructions For Your Safety Read Before LightingInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Doors, Surrounds, Fronts Remote ControlVenting Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopLED Light Bar Replacement Light Glass Replacement/CleaningBack Clean Porcelain PanelsRemove Screws Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Select Appliance Location Framing and ClearancesAssemble Steel Stud Kit Clearances Construct the Appliance ChaseClearances to Combustibles Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsTop Vent Horizontal Termination Vent DiagramsOne Elbow Three Elbows Two 45 Elbows replacing One 90 ElbowNo Elbow Top Vent Vertical TerminationTwo Elbows Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationCeiling firestop Must be used between floors and at- tics Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Secure and Level the Appliance Appliance PreparationAttach Pipe to the Firebox Assembly Install Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Metal Roof Flashing13 Assembling the Storm Collar Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination Cap16 Venting through the wall Install Horizontal Termination CapHHT Shrouds ShroudsField Constructed Shrouds Open Top Shroud may be used with DVP-TV, DVP-TVHWRoofed Style Shroud may be used with DVP-TV, DVP-TVHW Mailbox Style Shroud may be used with DVP-TV, DVP-TVHWGas Pressure Gas InformationGas Connection Setting Flame Height/Manifold Pressure Install Flame SolenoidElectrical Service and Repair Wiring RequirementsElectrical Information Junction Box Detail Junction Box InstallationStandard 1/2 in mm Sheetrock Wall FinishingAdditional Decorative Finishing over 1 in mm Thick Additional Decorative Finishing up to 1 in mm ThickRemove Glass Assembly Appliance SetupAir Shutter Access & Adjustment Clean the ApplianceCenter Burner Tube Air Shutter Outside Burner Tube Air Shutter AdjustmentInstall Glass Rock Install Glass RockIntelliFire IPI Ignition System TroubleshootingIntelliFire IPI Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Optional Components Do not Discard this Manual Contact Information