Heat & Glo LifeStyle LUX60 owner manual Wall Finishing, Standard 1/2 in mm Sheetrock

Page 47

14 Wall Finishing

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing or finishing material closer than the minimums listed must be construct- ed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

WARNING! Risk of Fire! DO NOT apply combustible ma- terials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will inter- fere with proper operation of doors and openings.

This appliance requires the use of noncombustible materials above the appliance. The use of the steel stud kit and noncombustible cement board is required.

It is very important when framing and setting this appli- ance, to consider what type of wall finishing will be used (i.e. sheet rock, tile, marble, rock, etc.).

The LUX60 is shipped with a steel stud kit and cement board. BOTH MUST BE USED above the appliance opening in the noncombustible zone (see Figure 14.1) regardless of the wall finishing to be used.

Finish wall material may

0 in.

be combustible,

 

Top and

 

Sides

 

Non-Combustible Zone

 

These joints

 

may be taped

 

and covered

 

with joint

 

compound.

0 in.

0 in.

High Temperature Sealant (300° F/149° C min.)

Figure 14.1 Noncombustible Facing Diagram

A. Standard 1/2 in. (13 mm) Sheetrock

If a standard 1/2 in. sheetrock wall finishing is to be used, the front edge of the appliance must be set 1/2 in. (13 mm) out in front of the framing to achieve a flush fit with the SSF-LUX-BK Surround Kit. See Figure 14.2.

Note: If using additional decorative facing on top of the sheetrock, see following instructions.

Sheetrock Wood Framing

Steel Stud Assy

1/2 in. Cement Board

Air Flow

Figure 14.2 1/2 in. Wall Finishing - Sheetrock

Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11

47

Image 47
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Reference Materials Limited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Operation of the LUX60 Fixed Glass AssemblyClear Space Decorative Doors and FrontsSystem Operation Before Lighting FireplaceMatching Security Codes IntelliFire Ignition System IPI Lighting Instructions For Your Safety Read Before LightingAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Venting Remote ControlDoors, Surrounds, Fronts Control Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxLED Light Bar Replacement Light Glass Replacement/CleaningBack Clean Porcelain PanelsRemove Screws Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Assemble Steel Stud Kit Framing and ClearancesSelect Appliance Location Clearances Construct the Appliance ChaseClearances to Combustibles Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyOne Elbow Vent DiagramsTop Vent Horizontal Termination Three Elbows Two 45 Elbows replacing One 90 ElbowTwo Elbows Top Vent Vertical TerminationNo Elbow Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingCeiling firestop Must be used between floors and at- tics Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Secure and Level the Appliance Appliance PreparationAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Metal Roof Flashing13 Assembling the Storm Collar Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination Cap16 Venting through the wall Install Horizontal Termination CapOpen Top Shroud may be used with DVP-TV, DVP-TVHW ShroudsHHT Shrouds Field Constructed ShroudsRoofed Style Shroud may be used with DVP-TV, DVP-TVHW Mailbox Style Shroud may be used with DVP-TV, DVP-TVHWGas Connection Gas InformationGas Pressure Setting Flame Height/Manifold Pressure Install Flame SolenoidElectrical Information Wiring RequirementsElectrical Service and Repair Junction Box Detail Junction Box InstallationStandard 1/2 in mm Sheetrock Wall FinishingAdditional Decorative Finishing over 1 in mm Thick Additional Decorative Finishing up to 1 in mm ThickClean the Appliance Appliance SetupRemove Glass Assembly Air Shutter Access & AdjustmentCenter Burner Tube Air Shutter Outside Burner Tube Air Shutter AdjustmentInstall Glass Rock Install Glass RockIntelliFire IPI Ignition System TroubleshootingIntelliFire IPI Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Optional Components Do not Discard this Manual Contact Information