Heat & Glo LifeStyle LUX60 Vent Clearances and Framing, Pipe Clearances to Combustibles

Page 31

8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

Refer to Fiture 8.1.

WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:

Between ceiling firestops

Between wall shield firestops

Around vent system

Failure to keep insulation or other material away from vent pipe may cause over heating and fire.

B. Wall Penetration Framing

Refer to Figure 8.2.

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop(s). The wall shield firestop maintains minimum clearances and prevents cold air infiltration.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

3 in.

 

 

(76 mm)

 

Air space clearance to

 

 

bottom and sides of

 

 

horizontal pipe must be

 

 

at least 1 in. (25 mm)

Cement

 

 

Board

 

 

Steel Stud

 

No combustible

Assembly

 

framing to be

 

 

located within

 

 

shaded area.

 

WALL

1-1/2 in. (13 mm)

 

minimum to

 

 

 

 

perpendicular

 

 

wall.

Figure 8.1 Horizontal Venting Clearances To Combustible Materi- als

• A wall shield firestop is required on one side only on

 

 

 

 

interior walls. If your local inspector requires a wall shield

 

 

 

 

firestop on both sides, then both wall shield firestops

 

 

10 in.

 

must have a heat shield attached to them.

 

 

(254 mm)

 

• See Section 10.I. for information for regarding the

12 in.

 

Vent Framing Hole

installation of a horizontal termination cap.

 

 

 

(305 mm)

 

 

 

 

 

 

 

Noncombustible Wall Penetration

 

 

 

 

If the hole being penetrated is surrounded by noncombus-

 

 

 

 

tible materials such as concrete, a hole with diameter one

 

 

 

 

inch greater than the pipe is acceptable.

 

 

 

 

Whenever a noncombustible wall is penetrated, the wall

 

 

Framing should be

 

shield firestop is only required on one side and no heat

 

 

 

 

 

constructed of

 

shield is necessary.

 

 

2x4 lumber.

 

 

 

 

The center of the

102 1/2 in.

 

 

 

framing hole is

(2604 mm)

 

 

 

1 in. (25 mm) above

from center of

 

 

 

the center of horizontal

pipe to bottom

 

 

 

vent pipe.

of appliance

 

 

 

 

6 in.

 

 

 

 

(152 mm)

 

Figure 8.2

Wall Penetration

 

Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11

 

31

Image 31
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Reference Materials Limited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Operation of the LUX60 Fixed Glass AssemblyClear Space Decorative Doors and FrontsMatching Security Codes Before Lighting FireplaceSystem Operation IntelliFire Ignition System IPI Lighting Instructions For Your Safety Read Before LightingInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Doors, Surrounds, Fronts Remote ControlVenting Control Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxLED Light Bar Replacement Light Glass Replacement/CleaningBack Clean Porcelain PanelsRemove Screws Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Select Appliance Location Framing and ClearancesAssemble Steel Stud Kit Clearances Construct the Appliance ChaseClearances to Combustibles Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyTop Vent Horizontal Termination Vent DiagramsOne Elbow Three Elbows Two 45 Elbows replacing One 90 ElbowNo Elbow Top Vent Vertical TerminationTwo Elbows Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingCeiling firestop Must be used between floors and at- tics Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Secure and Level the Appliance Appliance PreparationAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Metal Roof Flashing13 Assembling the Storm Collar Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination Cap16 Venting through the wall Install Horizontal Termination CapOpen Top Shroud may be used with DVP-TV, DVP-TVHW ShroudsHHT Shrouds Field Constructed ShroudsRoofed Style Shroud may be used with DVP-TV, DVP-TVHW Mailbox Style Shroud may be used with DVP-TV, DVP-TVHWGas Pressure Gas InformationGas Connection Setting Flame Height/Manifold Pressure Install Flame SolenoidElectrical Service and Repair Wiring RequirementsElectrical Information Junction Box Detail Junction Box InstallationStandard 1/2 in mm Sheetrock Wall FinishingAdditional Decorative Finishing over 1 in mm Thick Additional Decorative Finishing up to 1 in mm ThickClean the Appliance Appliance SetupRemove Glass Assembly Air Shutter Access & AdjustmentCenter Burner Tube Air Shutter Outside Burner Tube Air Shutter AdjustmentInstall Glass Rock Install Glass RockIntelliFire IPI Ignition System TroubleshootingIntelliFire IPI Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Optional Components Do not Discard this Manual Contact Information