Heat & Glo LifeStyle LUX60 owner manual Gas Information, Gas Pressure, Gas Connection

Page 43

12 Gas Information

A. Gas Pressure

Optimum appliance performance requires proper input pressures.

Gas line sizing requirements will be determined in ANSI Z221.3 National Fuel Gas Code in the USA and CAN/ CGA B149 in Canada.

Pressure requirements are:

Gas Pressure

Natural Gas

Propane

Minimum inlet pressure

5.0 in. w.c.

11.0 in. w.c.

Maximum inlet pressure

10.0 in. w.c.

13.0 in. w.c.

Manifold pressure

3.5 in. w.c.

10.0 in. w.c.

WARNING! Risk of Fire or Explosion! High pressure will damage valve. Low pressure may cause explosion.

Verify inlet pressures. Verify minimum pressures when other household gas appliances are operating.

Install regulator upstream of valve if line pressure is greater than 1/2 psig.

WARNING

Fire Risk.

Explosion Hazard.

High pressure will damage valve.

• Disconnect gas supply piping BEFORE pressure testing gas line at test pressures above 1/2 psig.

Close the manual shutoff valve BEFORE pressure testing gas line at test pressures equal to or less than 1/2 psig.

Note: Have the gas supply line installed in accordance with local codes, if any. If not, follow ANSI 223.1. Installation should be done by a qualified installer approved and/or licensed as required by the locality. (In the Commonwealth of Massachusetts installation must be performed by a licensed plumber or gas fitter).

Note: A listed (and Commonwealth of Massachusetts approved) 1/2 in. (13 mm) T-handle manual shut-off valve and flexible gas connector are connected to the 1/2 in. (13 mm) control valve inlet.

If substituting for these components, please consult local codes for compliance.

B. Gas Connection

Note: You MUST install a manual gas cock for the appliance in an accessible area no more than 6 ft from the appliance.

Refer to Reference Section 17.A. for location of gas line access in appliance.

Gas line may be run through knockout provided on the left side only.

The gap between supply piping and gas access hole may be caulked with caulk with a minimum of 300ºF continuous exposure rating or stuffed with noncombustible, unfaced insulation to prevent cold air infiltration.

Ensure that gas line does not come in contact with outer wrap of the appliance. Follow local codes.

Pipe incoming gas line into valve compartment.

Connect incoming gas line to the 1/2 in. (13 mm) connection on manual shutoff valve.

WARNING! Risk of Fire or Explosion! Support control when attaching pipe to prevent bending gas line.

A small amount of air will be in the gas supply lines.

WARNING! Risk of Fire or Explosion! Gas build-up dur- ing line purge could ignite.

Purge should be performed by qualified service technician.

Ensure adequate ventilation.

Ensure there are no ignition sources such as sparks or open flames.

Light the appliance. It will take a short time for air to purge from lines. When purging is complete the appliance will light and operate normally.

WARNING! Risk of Fire, Explosion or Asphyxiation! Check all fittings and connections with a non-corrosive commercially available leak-check solution. DO NOT use open flame. Fittings and connections could have loos- ened during shipping and handling.

WARNING! Risk of Fire! DO NOT change valve settings. This valve has been preset at the factory.

C. High Altitude Installations

NOTICE: If the heating value of the gas has been reduced, these rules do not apply. Check with your local gas utility or authorities having jurisdiction.

When installing above 2000 feet elevation:

In the USA: Reduce burner orifice 4% for each 1000 feet above 2000 feet.

In CANADA: Reduce burner orifice 10% for elevations between 2000 feet and 4500 feet. Above 4500 feet, consult local gas utility.

Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11

43

Image 43
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Reference Materials Limited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Operation of the LUX60 Fixed Glass AssemblyClear Space Decorative Doors and FrontsMatching Security Codes Before Lighting FireplaceSystem Operation IntelliFire Ignition System IPI Lighting Instructions For Your Safety Read Before LightingInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Doors, Surrounds, Fronts Remote ControlVenting Control Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxLED Light Bar Replacement Light Glass Replacement/CleaningBack Clean Porcelain PanelsRemove Screws Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Select Appliance Location Framing and ClearancesAssemble Steel Stud Kit Clearances Construct the Appliance ChaseClearances to Combustibles Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyTop Vent Horizontal Termination Vent DiagramsOne Elbow Three Elbows Two 45 Elbows replacing One 90 ElbowNo Elbow Top Vent Vertical TerminationTwo Elbows Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingCeiling firestop Must be used between floors and at- tics Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Secure and Level the Appliance Appliance PreparationAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Metal Roof Flashing13 Assembling the Storm Collar Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination Cap16 Venting through the wall Install Horizontal Termination CapOpen Top Shroud may be used with DVP-TV, DVP-TVHW ShroudsHHT Shrouds Field Constructed ShroudsRoofed Style Shroud may be used with DVP-TV, DVP-TVHW Mailbox Style Shroud may be used with DVP-TV, DVP-TVHWGas Pressure Gas InformationGas Connection Setting Flame Height/Manifold Pressure Install Flame SolenoidElectrical Service and Repair Wiring RequirementsElectrical Information Junction Box Detail Junction Box InstallationStandard 1/2 in mm Sheetrock Wall FinishingAdditional Decorative Finishing over 1 in mm Thick Additional Decorative Finishing up to 1 in mm ThickClean the Appliance Appliance SetupRemove Glass Assembly Air Shutter Access & AdjustmentCenter Burner Tube Air Shutter Outside Burner Tube Air Shutter AdjustmentInstall Glass Rock Install Glass RockIntelliFire IPI Ignition System TroubleshootingIntelliFire IPI Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Optional Components Do not Discard this Manual Contact Information