Heat & Glo LifeStyle LUX60 Install Vent Pipe, Assemble Vent Sections, Assemble Pipe Sections

Page 35

10 Install Vent Pipe

A. Assemble Vent Sections

Attach Pipe to the Firebox Assembly

Note: The end of the pipe sections with the lanced tabs will face towards the appliance.

Attach the first pipe section to the starting collar:

Lanced pipe end to the starting collar

Inner pipe over inner collar

Push the pipe section until all lanced tabs snap in place

Lightly tug on pipe to confirm it has locked.

Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications

All outer pipe joints must be sealed with silicone with a minimum of 300ºF continuous exposure rating, including the slip section that connects directly to the horizontal ter- mination cap.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.1

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are bro- ken during removal of the termination cap, vent may leak.

Figure 10.1 High Temperature Silicone Sealant

A

Lances

B

Figure 10.2

Figure 10.3

Assemble Pipe Sections

Start the inner pipe on the lanced end of section A into the flared end of section B.

Start the outer pipe of section A over the outer pipe of section B.

Once both vents sections are started, push firmly until all lanced tabs lock into place.

Lightly tug on the pipe to confirm the tabs have locked. It is acceptable to use screws no longer than 1/2 in. (13 mm) to hold outer pipe sections together. If predrilling holes, DO NOT penetrate inner pipe.

For 90° and 45° elbows that are changing the vent direc- tion from horizontal to vertical, one screw minimum should be put in the outer flue at the horizontal elbow joint to pre- vent the elbow from rotating. Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT pen- etrate inner pipe.

Note: Make sure that the seams are not aligned to prevent unintentional disconnection.

CORRECT

INCORRECT

Figure 10.4 Seams

Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11

35

Image 35
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Reference Materials Limited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Operation of the LUX60 Fixed Glass AssemblyClear Space Decorative Doors and FrontsSystem Operation Before Lighting FireplaceMatching Security Codes IntelliFire Ignition System IPI Lighting Instructions For Your Safety Read Before LightingAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Venting Remote ControlDoors, Surrounds, Fronts Control Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxLED Light Bar Replacement Light Glass Replacement/CleaningBack Clean Porcelain PanelsRemove Screws Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Assemble Steel Stud Kit Framing and ClearancesSelect Appliance Location Clearances Construct the Appliance ChaseClearances to Combustibles Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyOne Elbow Vent DiagramsTop Vent Horizontal Termination Three Elbows Two 45 Elbows replacing One 90 ElbowTwo Elbows Top Vent Vertical TerminationNo Elbow Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingCeiling firestop Must be used between floors and at- tics Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Secure and Level the Appliance Appliance PreparationAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Metal Roof Flashing13 Assembling the Storm Collar Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination Cap16 Venting through the wall Install Horizontal Termination CapOpen Top Shroud may be used with DVP-TV, DVP-TVHW ShroudsHHT Shrouds Field Constructed ShroudsRoofed Style Shroud may be used with DVP-TV, DVP-TVHW Mailbox Style Shroud may be used with DVP-TV, DVP-TVHWGas Connection Gas InformationGas Pressure Setting Flame Height/Manifold Pressure Install Flame SolenoidElectrical Information Wiring RequirementsElectrical Service and Repair Junction Box Detail Junction Box InstallationStandard 1/2 in mm Sheetrock Wall FinishingAdditional Decorative Finishing over 1 in mm Thick Additional Decorative Finishing up to 1 in mm ThickClean the Appliance Appliance SetupRemove Glass Assembly Air Shutter Access & AdjustmentCenter Burner Tube Air Shutter Outside Burner Tube Air Shutter AdjustmentInstall Glass Rock Install Glass RockIntelliFire IPI Ignition System TroubleshootingIntelliFire IPI Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Optional Components Do not Discard this Manual Contact Information