Heat & Glo LifeStyle LUX60 owner manual Two 45 Elbows replacing One 90 Elbow, Three Elbows

Page 29

1. Top Vent - Horizontal Termination - (continued)

Two 45° Elbows replacing One 90° Elbow

4 ft min.

(1.22 m)

3 ft min. (.91 m)

17 ft max. (5.18 m)

Figure 7.4

Three Elbows

V1

H1

V2

H2

3 ft (.91 m)

3 ft (.91 m)

4 ft (1.22 m)

4 ft (1.22 m)

6 ft (1.83 m)

8 ft (2.45 m)

8 ft (2.45 m)

12 ft (3.66 m)

H2

Installed

Vertically

V2

V1

H1

Figure 7.5

Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11

29

Image 29
Contents Models Installation and OperationHomeowner Reference Information CongratulationsTable of Contents Reference Materials Limited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Clear Space Fixed Glass AssemblyDecorative Doors and Fronts Operation of the LUX60System Operation Before Lighting FireplaceMatching Security Codes IntelliFire Ignition System IPI Lighting Instructions For Your Safety Read Before LightingAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Venting Remote ControlDoors, Surrounds, Fronts Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopLED Light Bar Replacement Light Glass Replacement/CleaningBack Clean Porcelain PanelsRemove Screws Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Assemble Steel Stud Kit Framing and ClearancesSelect Appliance Location Clearances Construct the Appliance ChaseClearances to Combustibles Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Three Elbows Two 45 Elbows replacing One 90 ElbowTwo Elbows Top Vent Vertical TerminationNo Elbow Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationCeiling firestop Must be used between floors and at- tics Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Secure and Level the Appliance Appliance PreparationAttach Pipe to the Firebox Assembly Install Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Metal Roof Flashing13 Assembling the Storm Collar Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination Cap16 Venting through the wall Install Horizontal Termination CapHHT Shrouds ShroudsField Constructed Shrouds Open Top Shroud may be used with DVP-TV, DVP-TVHWRoofed Style Shroud may be used with DVP-TV, DVP-TVHW Mailbox Style Shroud may be used with DVP-TV, DVP-TVHWGas Connection Gas InformationGas Pressure Setting Flame Height/Manifold Pressure Install Flame SolenoidElectrical Information Wiring RequirementsElectrical Service and Repair Junction Box Detail Junction Box InstallationStandard 1/2 in mm Sheetrock Wall FinishingAdditional Decorative Finishing over 1 in mm Thick Additional Decorative Finishing up to 1 in mm ThickRemove Glass Assembly Appliance SetupAir Shutter Access & Adjustment Clean the ApplianceCenter Burner Tube Air Shutter Outside Burner Tube Air Shutter AdjustmentInstall Glass Rock Install Glass RockIntelliFire IPI Ignition System TroubleshootingIntelliFire IPI Ignition System Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Optional Components Do not Discard this Manual Contact Information