Vermont Casting DTV38s2 Sidewall Installation with Stationary Glass Facing Outside

Page 21

X

FP1457

Fig. 22 Horizontal length requirement.

 

FP1458

Fig. 23

Through the wall.

 

FP1460

Fig. 24 Secure termination to wall.

Chateau™ Direct Vent Gas Fireplace

Support horizontal pipes every 3’ (914 mm) with metal pipe straps.

Check fireplace to make sure it is levelled and properly positioned.

Sidewall Installation with

Stationary Glass Facing Outside

CAUTION: Unit must be installed with station- ary glass facing outside. (Control housing will be located on the left side of the unit when facing the unit from inside the house.)

Failure to do so will result in a major reconstruction and CFM Corporation will not be responsible for costs associated with incorrect installation..

STEP 1

Locate vent opening on the wall. It may be necessary to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or noncombustible, cut opening to size. (Fig. 19)

For combustible walls first frame in opening.

Combustible Walls: Cut a 16¹⁄”H x 16¹⁄” W (413 x 413 mm) hole through the exterior wall and frame as shown.

Noncombustible Walls: Hole opening must be 11¹⁄” (286mm) in diameter.

STEP 2

Measure wall thickness and cut zero clearance sleeve parts to proper length (MAXIMUM 12”/305 mm). As- semble sleeve using #8 sheet metal screws (supplied). (Fig. 20) Install firestop assembly. (Fig. 35)

Zero clearance sleeve is only required for combustible walls.

STEP 3

Slide the zero clearance sleeve through the wall and install the firestop on the inside surface of the wall. Secure with four (4) #8 sheet metal screws.

STEP 4

Place fireplace into position. (Fig. 21) Measure the ver- tical height (X) required from the base of the flue collars to the center of the wall opening. NOTE: If using the SK8DVSK Kit, the vertical section of pipe is telescopic and could provide adjustment from 24” up to 40” (610 to 1016). Through the wall section shipped with the starter kit will not be used when going through the wall.

STEP 5

Tape the inner and outer flue collars of the fireplace using UL approved metal adhesive tape to ensure the joints are sealed. Attach an appropriate length of vent pipe to the fireplace. Follow with the installation of the inner and outer elbow, tape elbow joints and secure joints as described on Page 17.

20011957

21

Image 21
Contents What to do if YOU Smell GAS INSTALLER/CONSUMER Safety InformationTable of Contents Certified To Installation & Operating InstructionsAnsi Z21.50b-2005 / CSA 2.22b-2005 Vented Gas Fireplace Please Review the Following CarefullyRequirements for the Commonwealth of Massachusetts Clear of ALL ObstructionsGas Equipment Venting System not Provided Standard Framing Locating Your FireplaceMantels Clearance to CombustiblesHearth Framing and FinishingFinal Finishing Gas Specifications Gas Line InstallationGas Inlet and Manifold Pressures High ElevationsControl System Control System InstallationInside view of wireless wall switch Special Feature for Cold ClimatesKey Settings Hand-Held Remote Control Transmitter Operating InstructionsIntroduction LCD Liquid Crystal DisplayThermostat Function Manual FunctionContinuous Pilot Feature CP Childproof FeatureSetting LOCK-OUT CP Operational Notes Thermostatic Updating FeatureLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2Canadian Installations USA InstallationsGeneral Information Assembling Vent Pipes SK8 Venting Pipes Horizontal Termination Vertical TerminationSidewall Applications Step Sidewall InstallationZero clearance sleeve is only required for combustible walls Always install horizontal venting on a level planeHorizontal length requirement Sidewall Installation with Stationary Glass Facing OutsideInstalling the 38S2VDK Door Installation ProcedureRestrictor Plate Installation Flue Restrictor Plate InstallationFlue Restrictor Plate Guide Typical ApplicationsFlue restrictor plate use in straight up installation + 2 + 3 + 4 = Vertical Through-the-Roof InstallationMin Component Description Model Number Chimney ComponentsGlass Cleaning Glass Frame Assembly RemovalCeramic Refractory Installation Clean the glass after the first two weeks of operationDVT38Sw log identification Log, Lava Rock and Ember PlacementLog Pilot Plumbing F50 Overlay is very fragile Log Right Flame Characteristics Trim Installation Lighting & Operating Instructions Lighting InstructionsTurning Off the Gas to the Appliance Troubleshooting American Flame Gas Control SystemOperation Troubleshooting American Flame Gas Control System What to Check American Flame Gas Control System Error CodesConversion Precautions Conversion ProcedureFuel Conversion Instructions Remove pilot orifice DVT38S2 Injector Orifice Size Matrix Pilot Flame AdjustmentValve Minimum Rate Screw Conversion to LPMaintenance Cleaning the Control SystemBurner and Burner Compartment DVT38S2 Units GFYW5Q0 DVT38S2 DVT38S2Fuel Conversion Kits Accessories Back-up Battery KitWall Mountable Wireless Remote Transmitter Product Covered by this Warranty Limited Lifetime WarrantyModel EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings