INSTALLATION

RIGID PIPE VENTING

Horizontal or Vertical Terminations

The Rigid Pipe Venting System offers a complete line of component parts for installation of both horizontal and vertical installations. Many items are offered in decorative black, as well as galvanized finish. We recommend using the galvanized finish for installation with the P42.

The minimum components required for a basic horizontal termination are:

1Horizontal Termination Cap

190o Elbow

1Flue Adaptor

1Wall Thimble

1Length of pipe to suit wall thickness (see chart)

Wall thickness is measured from the back standoffs to the inside mounting surface of termination cap. For siding other than vinyl furring strips may be used, instead of the vinyl siding standoff, to create a level surface to mount the vent terminal. The Terminal must not be recessed into siding. Measure the wall thickness including furring strips.

If a Vinyl Siding Standoff is required (it must be used with vinyl siding), measure to outside surface of wall without siding and add 2 inches.

Alternate

Horizontal

Termination

Caps

Vertical

Terminal

Storm Collar

 

Part # 953

Vinyl Siding

 

Standoff (Optional)

Flashing

Part #950

 

943 or 943S

 

Ceiling Firestop

Horizontal

(Part # 963)

Termination

 

Cap

 

Wall Thimble

Pipe Length

Part # 942

Adj.Pipe Length

 

 

11" - 14-5/8"

 

90o Elbow

WARNING:

Do not combine venting components from different venting systems.

However use of the the AstroCapTM and FPI Riser is acceptable with all systems.

This product has been evaluated by Intertek for using a Dura-Vent Flue Adaptor in conjunction with Selkirk Direct-Temp and Ameri Vent Direct venting systems. Use of these systems with the Direct Vent GS starting collar is deemed acceptable and does not affect the Intertek WHI listing of components.

24" Pipe

Length

Rigid Pipe Adaptor

(Part# 510-994)

When using piping other than Simpson Dura-Vent, 3 screws must be used to secure rigid pipe to adaptor.

Flat Wall Installation

Wall Thickness

Vent Length

 

(inches)

Required (inches)

4"

-

5-1/2"

6"

 

7"

-

8-1/2"

9"

 

10"

- 11-1/2"

12"

 

9"

- 14-1/2"

11" - 14-5/8" Adj. Pipe

 

15"

- 23-1/2"

17" - 24" Adj. Pipe

Corner Installation

Wall Thickness

Vent Length

(inches)

Required (inches)

3-1/4" - 6-3/4"

11" - 14-5/8" Adj. Pipe

7-3/4" - 16-1/4"

17" - 24" Adj. Pipe

7-1/4"

-

8-3/4"

6" + 12"

 

 

 

 

9" + 9"

 

4-1/4"

-

5-3/4"

6" + 9"

 

The FPI AstroCapTM and FPI Riser Vent terminal is certified for installations using FPI venting systems as well as Simpson Dura-Vent®, Direct Vent GS, American Metal Products, Ameri Vent Direct vent and Selkirk Direct-Temp. FPITM, and FPI AstroCapTM are the proprietary trademarks of FPI Fireplace Products International Ltd. Dura-Vent® and Direct Vent GS are registered and/or proprietary trademarks of Simpson Dura-Vent Co. Inc.

12

Regency P42-3 Zero Clearance Direct Vent Gas Fireplace

Image 12
Contents P42 Gas Fireplace Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P42Installation General Safety InformationInstallation Checklist Save These InstructionsUnit Specifications Locating Your GAS Stove Manufactured Mobile Home Additional RequirementsOptional Duct System Optional Heat ReleaseClearances Mantels Mantel LEG ClearancesTOP Assembly Nailing Strips Framing FinishingVenting Introduction Vent Restrictor Exterior Vent Termination Venting Regency Direct Vent System Flex Horizontal Terminations OnlyRigid Pipe Venting Components List 4DT-AJBRigid Pipe Venting AlternateHorizontal TerminationRigid Pipe Venting Arrangements Horizontal Terminations Vent guard may be required, check local codesFor All Horizontal Terminations Rigid Pipe Venting Arrangements Vertical Terminations Propane & Natural GasVent restrictor #6 must be used Vertical Termination With CO-LINEAR Flex System Required PartsDescription Alternate Approved CapsInstallation Horizontal Installations Below Grade InstallationSnorkel Terminations Vertical Termination Continue to assemble pipe lengthsInstallation Procedures Offset ChartFor Regency Direct Vent System Flex GAS Line Installation GAS Pipe Pressure TestingHigh Elevation Aeration Brick Panels Adjustment LOG SET Installation Natural GASPropane Burner tray without front logs in placeStandard Flush Door Flush LouversDouble Screen Door Not under the gas lineOptional BAY Door BAY LouversOptional Bay Trim Full Screen Door Frame Installation Full Screen FrontHinge Location Bottom Grill Hinge Screen Door Wiring Diagram To Thermocouple T ValveDo not cut the ground terminal off under any circumstances Remote Control Optional Wall SwitchLighting Procedure Operating InstructionsTemperatures keep children, clothing Clean. See installationCopy of the Lighting Plate Instructions Maintenance MaintenanceShutdown Procedure First FireGlass Replacement LOG ReplacementGOLD-PLATED Louvers Thermopile ThermocoupleShut the power off Removing the FAN Replacing the FANInstalling Valve Parts List P42 Main AssemblyP42 Burner & LOG Assembly P42 Flush Door & Louvers P42 BAY Front & Louvers Regency P42-3 Zero Clearance Direct Vent Gas Fireplace Regency P42-3 Zero Clearance Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information