Regency P42-LP3 Installation Procedures, Offset Chart, For Regency Direct Vent System Flex

Page 21

INSTALLATION

Diagram 5

Roof Pitch

Minimum Vent Height

 

Feet

Meters

flat to 7/12

2

0.61

over 7/12 to 8/12

2

0.61

over 8/12 to 9/12

2

0.61

over 9/12 to 10/12

2.5

0.76

over 10/12 to 11/12

3.25

0.99

over 11/12 to 12/12

4

1.22

over 12/12 to 14/12

5

1.52

over 14/12 to 16/12

6

1.83

over 16/12 to 18/12

7

2.13

over 18/12 to 20/12

7.5

2.29

over 20/12 to 21/12

8

2.44

A poor draft, or down drafting can result from high wind conditions near big trees or adjoin- ing roof lines, in these cases, increasing the vent height may solve the problem.

7)Ensure vent is vertical and secure the base of the flashing to the roof with roofing rails, slide storm collar over the pipe section and seal with a mastic.

8)Install the vertical termination cap by twist- locking it.

Note: Any closets or storage spaces, which the vent passes through must be enclosed.

Offset Chart

INSTALLATION

PROCEDURES

for Regency Direct Vent

System (Flex)

1)Locate the unit in the framing, rough in the gas (preferably on the right side of the unit) and the electrical (Junction block is on the left side) on the left. Locate the centerline of the termination and mark wall accordingly. Cut a 10"(254mm) hole in the wall (inside dimen- sion).

Note: To make the installation more a e s t h e t i c a l l y pleasing, we rec- ommend framing out a square to mount the termi- nal to.

Note: A 1-1/2"(38mm) clearance around the liner must be maintained ex- cept that only a 1" (25mm) clear- ance is needed at the termination end. We recommend framing a 10"(254mm) x 10"(254mm) (inside dimensions) hole to give structur- al rigidity for mounting the termi- nation.

Note: If installing termination on a siding covered wall, furring strips must be used to ensure that the termi- nation is not recessed into the siding.

2)Level the fireplace and fasten it to the framing using nails or screws through the nailing strips.

3)Assemble the vent assembly by applying Mill Pac to the 4"(100mm) inner collar of the

termination and slipping the 4"(100mm) liner over it at least 1-3/8" (35mm). Fasten with the 3 screws (drilling pilot holes will make this easier). Apply Mill Pac or high temper- ature silicone to the 6-7/8"(175mm) flex pipe and slip it over the 6-7/8" outer collar of the vent terminal at least 1-3/8"(35mm) and fasten with the 3 screws.

NOTE: Horizontal sections must be sup- ported at intervals not exceeding 3 feet (0.9 meter). (Flame picture and performance will be affected by sags in the liner).

4)Separate the 2 halves of the wall thimble and securely fasten the one with the tabs to the outside wall making sure that the tabs are on top and bottom. Fasten the other thimble half to the inside wall. The thimble halves slip inside each other and can be adjusted for 2 x 4 or 2 x 6 walls. The liners must slip over the collars a minimum of 1-3/8".

5)Slip the assembled liner and termination assembly through the thimble making sure the termination cap faces up (there are markings on the cap that show which way is up). This will position the termination cap with proper down slope for draining water. Fasten the cap to the outer wall with the 4 supplied screws.

6)Pull the centre 4"(100mm) liner and outer 6- 7/8"(175mm) liner out enough to slip over the flue collars of the fireplace. (You may wish to cut the liner shorter to make it more workable.) Do not bend liner more than 90o.

7)Apply Mill Pac over the fireplace inner collar and slip the 4"(100mm) liner down over it and attach with 3 supplied screws.

8)Do the same with the 6-7/8"(175mm) liner.

9)Apply a bead of silicone between the thim- ble and termination and around the outer edge of the terminal at the wall in order to keep the water out.

IMPORTANT:

Do not locate termination hood where excessive snow or ice buildup may occur. Be sure to check vent termination area af- ter snow falls, and clear to prevent accidental block- age of venting system. When using snow blow- ers, make sure snow is not directed towards vent termination area.

Regency P42-3 Zero Clearance Direct Vent Gas Fireplace

21

Image 21
Contents P42 Gas Fireplace To the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Copy of Safety Decal for P42 Safety LabelGeneral Safety Information InstallationInstallation Checklist Save These InstructionsManufactured Mobile Home Additional Requirements Unit Specifications Locating Your GAS StoveOptional Duct System Optional Heat ReleaseMantel LEG Clearances Clearances MantelsFraming Finishing TOP Assembly Nailing StripsVenting Introduction Vent RestrictorExterior Vent Termination Regency Direct Vent System Flex Horizontal Terminations Only Venting4DT-AJB Rigid Pipe Venting Components ListAlternate Rigid Pipe VentingHorizontal TerminationVent guard may be required, check local codes Rigid Pipe Venting Arrangements Horizontal TerminationsFor All Horizontal Terminations Propane & Natural Gas Rigid Pipe Venting Arrangements Vertical TerminationsVent restrictor #6 must be used Required Parts Vertical Termination With CO-LINEAR Flex SystemDescription Alternate Approved CapsInstallation Horizontal Installations Below Grade InstallationSnorkel Terminations Continue to assemble pipe lengths Vertical TerminationInstallation Procedures Offset ChartFor Regency Direct Vent System Flex GAS Line Installation GAS Pipe Pressure TestingHigh Elevation Aeration Brick Panels Adjustment Natural GAS LOG SET InstallationPropane Burner tray without front logs in placeFlush Louvers Standard Flush DoorDouble Screen Door Not under the gas lineOptional BAY Door BAY LouversOptional Bay Trim Full Screen Front Full Screen Door Frame InstallationHinge Location Bottom Grill Hinge Screen Door Wiring Diagram To Thermocouple T ValveDo not cut the ground terminal off under any circumstances Optional Wall Switch Remote ControlLighting Procedure Operating InstructionsTemperatures keep children, clothing Clean. See installationCopy of the Lighting Plate Instructions Maintenance MaintenanceShutdown Procedure First FireLOG Replacement Glass ReplacementGOLD-PLATED Louvers Thermopile ThermocoupleRemoving the FAN Replacing the FAN Shut the power offInstalling Valve P42 Main Assembly Parts ListP42 Burner & LOG Assembly P42 Flush Door & Louvers P42 BAY Front & Louvers Regency P42-3 Zero Clearance Direct Vent Gas Fireplace Regency P42-3 Zero Clearance Direct Vent Gas Fireplace Conditions WarrantyInstaller Please complete the following information