INSTALLATION

FRAMING AND

FINISHING

1)The facing allows for 1/2" (13mm) of dry- wall material. The unit may be installed directly on/or against standard combusti- ble building materials.

2)Frame in the enclosure for the unit with framing material. The framed opening for the assembled kit is 36-5/8" high x 40-1/4" wide x 19" deep (930mm H x 1022mm W x 483mm D). See Diagram 1.

Diagram 1

5)The unit does not have to be completely enclosed in a chase. The clearance on top of the unit from the top standoffs is 0" so combustible building materials can be laid directly on top of the standoffs. You must maintain these clearances from the vent to combustible materials: Flex Termination clearance 1-1/2" (38mm), Simpson Dura- Vent clearance or (1-1/4" (32mm). Combus- tible materials can be laid against the side and back standoffs and the stove base.

The HeatWave Duct Kit has different clearance and framing requirements, check the HeatWave manual for details.

TOP ASSEMBLY &

NAILING STRIPS

The Top Facing Support and Side Nailing Strips must be correctly positioned and attached be- fore the unit is slipped into position.

1)The top standoffs are shipped installed.

2)The Top Facing Support and the 2 Side Nailing Strips can be installed at different depths depending on the width of your facing. Match the depths of the top facing support and the side nailing strips.

a)Mount Top Facing Support using the 3 supplied screws into the 3 pre-punched screw holes on the top front of the unit. See Diagrams 2 & 3 for the proper position of the Top Facing Support for the various material depths.

Diagram 3

Diagram 4

b)Mount the Side Nailing Strip using the 3 supplied screws into the 3 screw holes or slots (diagram 4) on the side of the unit and repeat for the other side. Use the hole for a 1/2" (13mm) thick facing material and the slot for a range of thickness from 1" to 1-1/2" (25mm to 38mm).

VENTING

INTRODUCTION

The P42 uses the "balanced flue" technology Co Axial system. The inner liner vents products of combustion to the outside while the outer liner draws outside combustion air into the combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney.

Note: These flue pipes must not be con- nected to any other appliance.

The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid fuel or gas burning appliance. Each direct vent gas appliance must use it's own separate vent system. Common vent sys- tems are prohibited.

Note: 43" (1092mm) is the minimum height for flex termination and Simpson Dura-Vent terminations.

3)For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.)

4)The top louvers must not be closer than 36" (914mm) to the ceiling.

Diagram 1

Diagram 2

VENT RESTRICTOR

A vent restrictor may be required. Check the diagrams on pages 13 to 18 to determine if the #6 restrictor is needed for your vent configu- ration. If required, attach the 2 piece #6 restric- tor using 4 screws per piece to the inside top of the firebox.

8

Regency P42-3 Zero Clearance Direct Vent Gas Fireplace

Image 8
Contents P42 Gas Fireplace Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P42Installation General Safety InformationInstallation Checklist Save These InstructionsUnit Specifications Locating Your GAS Stove Manufactured Mobile Home Additional RequirementsOptional Duct System Optional Heat ReleaseClearances Mantels Mantel LEG ClearancesTOP Assembly Nailing Strips Framing FinishingVenting Introduction Vent RestrictorExterior Vent Termination Venting Regency Direct Vent System Flex Horizontal Terminations OnlyRigid Pipe Venting Components List 4DT-AJBRigid Pipe Venting AlternateHorizontal TerminationRigid Pipe Venting Arrangements Horizontal Terminations Vent guard may be required, check local codesFor All Horizontal Terminations Rigid Pipe Venting Arrangements Vertical Terminations Propane & Natural GasVent restrictor #6 must be used Vertical Termination With CO-LINEAR Flex System Required PartsDescription Alternate Approved CapsInstallation Snorkel Terminations Horizontal InstallationsBelow Grade Installation Vertical Termination Continue to assemble pipe lengthsFor Regency Direct Vent System Flex Installation ProceduresOffset Chart High Elevation GAS Line InstallationGAS Pipe Pressure Testing Aeration Brick Panels Adjustment LOG SET Installation Natural GASPropane Burner tray without front logs in placeStandard Flush Door Flush LouversDouble Screen Door Not under the gas lineOptional Bay Trim Optional BAY DoorBAY Louvers Full Screen Door Frame Installation Full Screen FrontHinge Location Bottom Grill Hinge Screen Door Do not cut the ground terminal off under any circumstances Wiring DiagramTo Thermocouple T Valve Remote Control Optional Wall SwitchLighting Procedure Operating InstructionsCopy of the Lighting Plate Instructions Temperatures keep children, clothingClean. See installation Maintenance MaintenanceShutdown Procedure First FireGlass Replacement LOG ReplacementGOLD-PLATED Louvers Thermopile ThermocoupleShut the power off Removing the FAN Replacing the FANInstalling Valve Parts List P42 Main AssemblyP42 Burner & LOG Assembly P42 Flush Door & Louvers P42 BAY Front & Louvers Regency P42-3 Zero Clearance Direct Vent Gas Fireplace Regency P42-3 Zero Clearance Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information