Regency L676-NG1 Unit Installation With Vertical Termination, Rigid Vent Systems, Diagram

Page 24
UNIT INSTALLATION

INSTALLATION

INSTALLATION

UNIT INSTALLATION

WITH VERTICAL

TERMINATION

(Rigid Vent Systems)

Note: A clearance of 2"(51mm) must be maintained; except when passing through a wall, ceiling, or at the termination where the use of a firestop or wall thimble reduces the required clearance to 1-1/2" (38mm). We recommend framing a 11"(279mm) x 11"(279mm) (inside dimensions) hole to give structural rigidity for mounting the termination.

1) Maintain the 2" (51mm) clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafter, or other nearby combustible surfaces. Do not pack air spaces with insulation. Check "Venting Arrangemnt - Vertical Termination" s e c t i o n f o r t h e maximum vertical rise of the venting system and the maximum horizontal offset limitations.

2) Set the gas appliance

Diagram 1

 

in its desired location.

 

Drop a plumb bob

 

down from the ceiling

 

to the position of the

 

appliance flue exit,

 

and mark the location

 

where the vent will

 

penetrate the ceiling.

 

Drill a small hole at

 

his point. Next, drop

 

a plumb bob from

 

the roof to the hole

 

previously drilled in

 

the ceiling, and mark

 

the spot where the

Diagram 2

vent will penetrate the roof. Determine if ceiling joists, roof rafters or other framing will obstruct the venting system. You may wish to relocate the appliance or to offset, as shown in Diagram 2 to avoid cutting load bearing members.

3)A Firestop spacer must be installed in the floor or ceiling of every level.

Diagram 3

4)Assemble the desired lengths of pipe and elbows. Ensure that all pipes and elbow connections are in the fully twist-locked position and sealed.

Note:

For best results and optimum performance with each approved venting system, it is highly recommended to apply “Mill-Pac” sealant (supplied) to every inner pipe connec- tion. Failure to do so may result in drafting or performance issues not covered under warranty. Silicone (red RTV) is optional.

5)Cut a hole in the roof centered on the small drilled hole placed in the roof in Step 2. The hole should be of sufficient size to meet the minimum requirements for clearance to combustiblesof1-1/2"(38mm).Sliptheflashing under the shingles (shingles should overlap half the flashing) as per Diagram 4.

Diagram 4: The upper half of the flashing is installed under the roofing material and not nailed down until the chimney is installed.

This allows for small adjustments.

6)Continue to assemble pipe lengths.

Note: If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 feet (0.9 meter), to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose

(Diagram 2).

Galvanizedpipeisdesirableabovetheroofline duetoitshighercorrosionresistance.Continue to add pipe sections through the flashing until the height of the vent cap meets the minimum height requirements specified in Diagram 5 or local codes. Note that for steep roof pitches, the vertical height must be increased.

Diagram 5

 

Minimum Vent

Roof Pitch

 

Height

 

Feet

 

Meters

flat to 7/12

2

 

0.61

over 7/12 to 8/12

2

 

0.61

over 8/12 to 9/12

2

 

0.61

over 9/12 to 10/12

2.5

 

0.76

over 10/12 to 11/12

3.25

 

0.99

over 11/12 to 12/12

4

 

1.22

over 12/12 to 14/12

5

 

1.52

over 14/12 to 16/12

6

 

1.83

over 16/12 to 18/12

7

 

2.13

over 18/12 to 20/12

7.5

 

2.29

A poor draft, or down drafting can result from highwindconditionsnearbigtreesoradjoining roof lines, in these cases, increasing the vent height may solve the problem.

7)Ensure vent is vertical and secure the base of the flashing to the roof with roofing rails, slide storm collar over the pipe section and seal with a mastic.

8)Install the vertical termination cap by twist- locking it.

Note: Any closets or storage spaces, which the vent passes through must be enclosed.

Offset Chart

24

Regency® L676-1 Direct Vent Gas Fireplace

Image 24
Contents LIBERTY L676-1Gas Fireplace Congratulations MANUFACTURED MOBILE HOME REQUIREMENTSTABLE OF CONTENTS SAFETY LABELINSTALLATION WARRANTYSAFETY LABEL INSTALLATIONREQUIREMENTS INSTALLATIONMA Code - CO Detector 5.08: Modifications to NFPA-54,ChapterUNIT DIMENSIONS INSTALLATIONRegency L676-1Direct Vent Gas Fireplace INSTALLATION GENERAL SAFETY INFORMATIONINSTALLATION CHECKLIST INSTALLATIONINSTALLATION INSTALLATIONDiagram HEAT RELEASE KITINSTALLATION CLEARANCESClearance to Combustibles from Minimum Clearance from Top of Front FacingINSTALLATION INSTALLATIONMANTEL CLEARANCES MANTEL LEG CLEARANCESINSTALLATION INSTALLATIONDiagram Diagram DiagramINSTALLATION UNIT ASSEMBLY PRIOR TO INSTALLATIONINSTALLATION FINISHING TEMPLATEINSTALLATION INSTALLATIONVENT RESTRICTOR POSITION Vent Restrictor PlateINSTALLATION INSTALLATIONEXTERIOR VENT TERMINATION REQUIREMENTS Minimum Clearance RequirementsINSTALLATION INSTALLATIONVENTING ARRANGEMENTS FPI Kit #INSTALLATION INSTALLATIONWhen using Rigid Vent other than RIGID PIPE VENTING SYSTEMSINSTALLATION 5” X 8” RIGID PIPE CROSS REFERENCE CHARTINSTALLATION INSTALLATION INSTALLATIONRegency L676-1Direct Vent Gas Fireplace INSTALLATION INSTALLATIONVENT RESTRICTOR SETTING VENTING ARRANGEMENTSINSTALLATION INSTALLATIONHorizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsINSTALLATION INSTALLATIONVENT RESTRICTOR SETTING Vertical Venting with Three 3 90o ElbowsINSTALLATION INSTALLATIONVENTING ARRANGEMENTS ALLOWABLE VERTICAL TERMINATIONSINSTALLATION UNIT INSTALLATION WITH HORIZONTAL TERMINATIONINSTALLATION DiagramINSTALLATION UNIT INSTALLATION WITH VERTICAL TERMINATIONINSTALLATION DiagramINSTALLATION UNIT INSTALLATIONINSTALLATION ASTROCAP XL DIMENSIONS 946-623/PINSTALLATION PILOT ADJUSTMENTGAS LINE INSTALLATION TESTINGINSTALLATION AERATION ADJUSTMENTWIRING DIAGRAM INSTALLATIONINSTALLATION INSTALLATIONCONVERSION KIT #522-969FROM NG TO LP LP Conversion Kit ContainsINSTALLATION INSTALLATIONNOTE Once the unit has been installed Burner TubeINSTALLATION BRICK PANEL INSTALLATIONINSTALLATION Diagram Right Side Rod with Screen RemovedINSTALLATION INSTALLATIONBurner Orifi ce Cover Plate Diagram DiagramINSTALLATION LOG SET INSTALLATIONINSTALLATION Log kit # 522-930contains the following piecesINSTALLATION INSTALLATION5 Fit log A into the pins on the log tray 7 Fit log E into the pin at the center of log AINSTALLATION INSTALLATIONF BA C 1st Grate PostINSTALLATION INSTALLATIONCompleted Log Set Installation E F A B CINSTALLATION MESH PULL SCREEN INSTALLATIONINSTALLATION Left Side Rod Right Side RodOPTIONAL ANDIRON INSTALLATION INSTALLATIONFinal Installation L900-1 Log GOPERATING INSTRUCTIONS MATCHING REMOTE CONTROL & RECEIVER CODELIGHTING PROCEDURE SHUTDOWN PROCEDUREOPERATING INSTRUCTIONS NORMAL OPERATING SOUNDS OF GAS APPLIANCESCOPY OF LIGHTING PLATE INSTRUCTIONS DO NOT REMOVE THIS INSTRUCTION PLATEMAINTENANCE MAINTENANCE INSTRUCTIONSLOG REPLACEMENT GENERAL VENT MAINTENANCEMAINTENANCE DC SPARK BOX BATTERY REPLACEMENTDC SPARK BOX REPLACEMENT MAINTENANCEMAINTENANCE VALVE TRAY REPLACEMENTMAINTENANCE Latch Location LatchMAINTENANCE MAINTENANCEDC Spark Box DC Spark BoxPARTS LIST MAIN ASSEMBLYPARTS LIST Part #PARTS LIST PARTS LISTPARTS LIST BURNER & LOG ASSEMBLYPARTS LIST Part #WARRANTY The Warranty: Limited LifetimeConditions ExclusionsSee the inside back cover for details