INSTALLATION
CLEARANCES
The clearances listed below are Minimum distances unless otherwise stated:
A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions.
INSTALLATION
Caution Requirements
The top, back and sides of the fireplace are defined by standoffs. The metal ends of the standoff may NOT be
recessed into combustible construction.
Clearance to Combustibles from:
Back 0" (0mm)
Side 0" (0mm)
Floor 0" (0mm)
Minimum Clearance from Top of Front Facing:
Mantel | min. | (419mm) |
Ceiling | 52" | (813mm) from top of front facing |
Side Wall to Unit:
Horizontal Vent Clearances to Combustibles:
Top | 3" | (76mm) |
Side | 2" | (51mm) |
Bottom | 2" | (51 mm) |
Vertical Vent Clearances to Combustibles:
All Sides | 2" | (51mm) |
Alcove Clearances:
Min. Depth | 36" | (914mm) |
Min. Width* | 84" | (2134mm) |
Min. Height | 84" | (2032mm) |
NOTE: Only materials such as, but not limited to durarock, wonderboard and concrete board may be put on the front face of this appliance. See specific requirements under "Framing and Finishing" section.
* Alcove side wall must have a minimum of
IMPORTANT: Must install 1 set of brick panels. The operation of this unit without brick panels is prohibited.
WARNING |
| IMPORTANT |
Fire hazard is an extreme risk |
| If converting this unit to LP, it is highly recommened |
if these clearances (air space) to combustible materials |
| |
| the conversion be done BEFORE the unit is slid into | |
are not adhered to. It is of greatest importance that this |
| |
fireplace and vent system be installed only in |
| position for ease of conversion. See "Conversion |
accordance with these instructions. |
| from NG to LP" section for instructions. |
|
|
|
|
|
|
Regency® | 9 |