Regency L676-LP1 Unit Installation With Horizontal Termination, Rigid Vent Systems, Diagram

Page 23
UNIT INSTALLATION WITH HORIZONTAL TERMINATION

INSTALLATION

UNIT INSTALLATION WITH HORIZONTAL TERMINATION

(Rigid Vent Systems)

Atopclearanceof3"(76mm)andside&bottom clearance of 2"(51mm) must be maintained; except when passing through a wall, ceil- ing, or at the termination where the use of a firestop or wall thimble reduces the required clearance to 1-1/2" (38mm). We recommend framing a 11"(279mm) x 11"(279mm) (inside dimensions) hole to give structural rigidity for mounting the termination.

Install the vent system according to the manufacturer's instructions included with the components.

1)Set the unit in its desired location. Check to determine if wall studs or roof rafters are in the way when the venting system is attached. If this is the case, you may want to adjust the location of the unit. Rough in the gas preferably on the right side of the unit and the electrical (junction block is on the left side) on the left.

2)Direct Vent pipe and fittings are designed with special twist-lock connections to connect the venting system to the appliance flue outlet. A twist-lock appliance adaptor is required.

3)In conjunction with the Simpson Direct Vent Pro system, install the adaptor after the unit is set in its desired location. Put a bead of high temperature silicone inside the outer section of the adapter and a bead of Mill Pack on the inner collar. Slip the adapter over the existing inner and outer flue collar. Fasten to the outer collar only with the 3 supplied screws (drilling pilot holes will make this easier).

4)Level the fireplace and fasten it to the framing using nails or screws through the top and side nailing strips.

5)Assemble the desired combination of pipe and elbows to the appliance adaptor and twist-lock for a solid connection.

Note: For best results and optimum performance with each approved venting system, it is highly recommended to apply “Mill-Pac” sealant (supplied) to every inner pipe connection. Failure to do so may result in drafting or performance issues not covered under warranty. Silicone (red RTV) is optional.

Horizontal runs of vent must be supported every 3 feet (0.9meter). Wall straps are available for this purpose.

6)Mark the wall for a 11" x 11" (279mm x 279mm) square hole. The center of the square hole should line up with the center- line of the horizontal pipe. Cut and frame the 11 inch (279mm) square hole in the exterior wall where the vent will be terminated. See diagram 2 for center line requirements.

If the wall being penetrated is constructed of non-combustible material, i.e. masonry block or concrete, an 8" (203mm) diameter hole is acceptable.

Diagram 2

Note:

a)The horizontal run of vent must be level, or have a 1/4 inch rise for every 1 foot of run towards the termination. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a fire.

b)The location of the horizontal vent termination on an exterior wall must meet all local and national building codes, and must not be blocked or obstructed. See "Exterior Vent Termination Locations" section for more details.

7)Ensure that the pipe clearances to combustible materials are maintained (Diagram 5). Install the termination cap.

Note: If installing termination on a vinyl siding covered wall, a vinyl siding standoff or furring strips must be used to ensure that the termination is not recessed into the siding.

Diagram 5

The four wood screws provided should be re- placed with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

8)Before connecting the horizontal run of vent pipe to the vent termination, slide the Wall Thimble over the vent pipe. The wall thimble is required for all horizontal terminations.

9)Slide the appliance and vent assembly towards the wall carefully inserting the vent pipe into the vent cap assembly. It is important that the vent pipe extends into the vent cap sufficient distance so as to result in a minimum pipe overlap of 1-1/4 inches (32mm). Secure the connection between the vent pipe and the vent cap.

10)Install wall thimble in the center of the 11" (279mm) square and attach with wood screws (Diagram 7).

INSTALLATION

Diagram 7

Diagram 1

Regency® L676-1 Direct Vent Gas Fireplace

23

Image 23
Contents LIBERTY L676-1Gas Fireplace MANUFACTURED MOBILE HOME REQUIREMENTS CongratulationsWARRANTY TABLE OF CONTENTSSAFETY LABEL INSTALLATIONINSTALLATION SAFETY LABEL5.08: Modifications to NFPA-54,Chapter REQUIREMENTSINSTALLATION MA Code - CO DetectorRegency L676-1Direct Vent Gas Fireplace UNIT DIMENSIONSINSTALLATION INSTALLATION INSTALLATIONGENERAL SAFETY INFORMATION INSTALLATION CHECKLISTHEAT RELEASE KIT INSTALLATIONINSTALLATION DiagramMinimum Clearance from Top of Front Facing INSTALLATIONCLEARANCES Clearance to Combustibles fromMANTEL LEG CLEARANCES INSTALLATIONINSTALLATION MANTEL CLEARANCESDiagram INSTALLATIONINSTALLATION Diagram DiagramFINISHING TEMPLATE INSTALLATIONUNIT ASSEMBLY PRIOR TO INSTALLATION INSTALLATIONVent Restrictor Plate INSTALLATIONINSTALLATION VENT RESTRICTOR POSITIONMinimum Clearance Requirements INSTALLATIONINSTALLATION EXTERIOR VENT TERMINATION REQUIREMENTSFPI Kit # INSTALLATIONINSTALLATION VENTING ARRANGEMENTSRIGID PIPE VENTING SYSTEMS INSTALLATIONINSTALLATION When using Rigid Vent other thanINSTALLATION INSTALLATION5” X 8” RIGID PIPE CROSS REFERENCE CHART Regency L676-1Direct Vent Gas Fireplace INSTALLATIONINSTALLATION VENTING ARRANGEMENTS INSTALLATIONINSTALLATION VENT RESTRICTOR SETTINGHorizontal Venting with Three 3 90o Elbows INSTALLATIONINSTALLATION Horizontal Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows INSTALLATIONINSTALLATION VENT RESTRICTOR SETTINGALLOWABLE VERTICAL TERMINATIONS INSTALLATIONINSTALLATION VENTING ARRANGEMENTSDiagram INSTALLATIONUNIT INSTALLATION WITH HORIZONTAL TERMINATION INSTALLATIONDiagram INSTALLATIONUNIT INSTALLATION WITH VERTICAL TERMINATION INSTALLATIONASTROCAP XL DIMENSIONS 946-623/P INSTALLATIONUNIT INSTALLATION INSTALLATIONTESTING INSTALLATIONPILOT ADJUSTMENT GAS LINE INSTALLATIONINSTALLATION INSTALLATIONAERATION ADJUSTMENT WIRING DIAGRAMLP Conversion Kit Contains INSTALLATIONINSTALLATION CONVERSION KIT #522-969FROM NG TO LPBurner Tube INSTALLATIONINSTALLATION NOTE Once the unit has been installedDiagram Right Side Rod with Screen Removed INSTALLATIONBRICK PANEL INSTALLATION INSTALLATIONDiagram INSTALLATIONINSTALLATION Burner Orifi ce Cover Plate DiagramLog kit # 522-930contains the following pieces INSTALLATIONLOG SET INSTALLATION INSTALLATION7 Fit log E into the pin at the center of log A INSTALLATIONINSTALLATION 5 Fit log A into the pins on the log tray1st Grate Post INSTALLATIONINSTALLATION F BA CE F A B C INSTALLATIONINSTALLATION Completed Log Set InstallationLeft Side Rod Right Side Rod INSTALLATIONMESH PULL SCREEN INSTALLATION INSTALLATIONLog G OPTIONAL ANDIRON INSTALLATIONINSTALLATION Final Installation L900-1SHUTDOWN PROCEDURE OPERATING INSTRUCTIONSMATCHING REMOTE CONTROL & RECEIVER CODE LIGHTING PROCEDUREDO NOT REMOVE THIS INSTRUCTION PLATE OPERATING INSTRUCTIONSNORMAL OPERATING SOUNDS OF GAS APPLIANCES COPY OF LIGHTING PLATE INSTRUCTIONSGENERAL VENT MAINTENANCE MAINTENANCEMAINTENANCE INSTRUCTIONS LOG REPLACEMENTMAINTENANCE MAINTENANCEDC SPARK BOX BATTERY REPLACEMENT DC SPARK BOX REPLACEMENTLatch Location Latch MAINTENANCEVALVE TRAY REPLACEMENT MAINTENANCEDC Spark Box MAINTENANCEMAINTENANCE DC Spark BoxPart # PARTS LISTMAIN ASSEMBLY PARTS LISTPARTS LIST PARTS LISTPart # PARTS LISTBURNER & LOG ASSEMBLY PARTS LISTExclusions WARRANTYThe Warranty: Limited Lifetime ConditionsSee the inside back cover for details