Regency L676-NG1 Brick Panel Installation, Handle with care. DO NOT FORCE INTO POSITION

Page 30
BRICK PANEL INSTALLATION

INSTALLATION

BRICK PANEL INSTALLATION

IMPORTANT: Must install 1 set of brick panels. The operation of this unit without the brick panels is prohibited.

Dangerous operating conditions may occur if the panels are broken.

Handle with care. DO NOT FORCE INTO POSITION.

INSTALLATION

1)Remove the right side mesh by gathering the mesh together and lifting the curved end of the rod up and out of the bracket located on the top right of the glass frame.

Now slide the straight end of the rod out from the bracket located on the middle inside top of the outer shell. Repeat for left side.

Diagram 1

Right Side Rod with

Screen Removed

Diagram 2

2)Remove the front cover plate by lifting up off of the pins on the left and right side of the fi rebox.

Latch

Diagram 5

b. Swing the door out from the top and release the hinge on the left side of the door and lift out.

Hinge

Diagram 6

Door

c. Place the door on a soft surface to prevent scratching.

4)Unwrap the brick panels from the protective wrapping.

Note: The logs must not be in the unit.

5)Remove the 2 brick panel clips on the inside top left and top right side of the fi rebox by removing the screw.

Diagram 3

Front Cover Plate

Right Side Pin Shown

3)Remove the glass door.

a. Release the 2 door latches on the left and right side at the top of the fi rebox.

Latch Location

Diagram 4

 

Brick

Panel Handle with care. DO NOT FORCE INTO POSITION.

Clip

Screw

L676-1L900-1

Diagram 7

30

Regency® L676-1 Direct Vent Gas Fireplace

Image 30
Contents LIBERTY L676-1Gas Fireplace Congratulations MANUFACTURED MOBILE HOME REQUIREMENTSINSTALLATION TABLE OF CONTENTSSAFETY LABEL WARRANTYSAFETY LABEL INSTALLATIONMA Code - CO Detector REQUIREMENTSINSTALLATION 5.08: Modifications to NFPA-54,ChapterUNIT DIMENSIONS INSTALLATIONRegency L676-1Direct Vent Gas Fireplace INSTALLATION CHECKLIST INSTALLATIONGENERAL SAFETY INFORMATION INSTALLATIONDiagram INSTALLATIONINSTALLATION HEAT RELEASE KITClearance to Combustibles from INSTALLATIONCLEARANCES Minimum Clearance from Top of Front FacingMANTEL CLEARANCES INSTALLATIONINSTALLATION MANTEL LEG CLEARANCESDiagram Diagram INSTALLATIONINSTALLATION DiagramINSTALLATION INSTALLATIONUNIT ASSEMBLY PRIOR TO INSTALLATION FINISHING TEMPLATEVENT RESTRICTOR POSITION INSTALLATIONINSTALLATION Vent Restrictor PlateEXTERIOR VENT TERMINATION REQUIREMENTS INSTALLATIONINSTALLATION Minimum Clearance RequirementsVENTING ARRANGEMENTS INSTALLATIONINSTALLATION FPI Kit #When using Rigid Vent other than INSTALLATIONINSTALLATION RIGID PIPE VENTING SYSTEMSINSTALLATION 5” X 8” RIGID PIPE CROSS REFERENCE CHARTINSTALLATION INSTALLATION INSTALLATIONRegency L676-1Direct Vent Gas Fireplace VENT RESTRICTOR SETTING INSTALLATIONINSTALLATION VENTING ARRANGEMENTSHorizontal Venting with Two 2 90o Elbows INSTALLATIONINSTALLATION Horizontal Venting with Three 3 90o ElbowsVENT RESTRICTOR SETTING INSTALLATIONINSTALLATION Vertical Venting with Three 3 90o ElbowsVENTING ARRANGEMENTS INSTALLATIONINSTALLATION ALLOWABLE VERTICAL TERMINATIONSINSTALLATION INSTALLATIONUNIT INSTALLATION WITH HORIZONTAL TERMINATION DiagramINSTALLATION INSTALLATIONUNIT INSTALLATION WITH VERTICAL TERMINATION DiagramINSTALLATION INSTALLATIONUNIT INSTALLATION ASTROCAP XL DIMENSIONS 946-623/PGAS LINE INSTALLATION INSTALLATIONPILOT ADJUSTMENT TESTINGWIRING DIAGRAM INSTALLATIONAERATION ADJUSTMENT INSTALLATIONCONVERSION KIT #522-969FROM NG TO LP INSTALLATIONINSTALLATION LP Conversion Kit ContainsNOTE Once the unit has been installed INSTALLATIONINSTALLATION Burner TubeINSTALLATION INSTALLATIONBRICK PANEL INSTALLATION Diagram Right Side Rod with Screen RemovedBurner Orifi ce Cover Plate Diagram INSTALLATIONINSTALLATION DiagramINSTALLATION INSTALLATIONLOG SET INSTALLATION Log kit # 522-930contains the following pieces5 Fit log A into the pins on the log tray INSTALLATIONINSTALLATION 7 Fit log E into the pin at the center of log AF BA C INSTALLATIONINSTALLATION 1st Grate PostCompleted Log Set Installation INSTALLATIONINSTALLATION E F A B CINSTALLATION INSTALLATIONMESH PULL SCREEN INSTALLATION Left Side Rod Right Side RodFinal Installation L900-1 OPTIONAL ANDIRON INSTALLATIONINSTALLATION Log GLIGHTING PROCEDURE OPERATING INSTRUCTIONSMATCHING REMOTE CONTROL & RECEIVER CODE SHUTDOWN PROCEDURECOPY OF LIGHTING PLATE INSTRUCTIONS OPERATING INSTRUCTIONSNORMAL OPERATING SOUNDS OF GAS APPLIANCES DO NOT REMOVE THIS INSTRUCTION PLATELOG REPLACEMENT MAINTENANCEMAINTENANCE INSTRUCTIONS GENERAL VENT MAINTENANCEDC SPARK BOX REPLACEMENT MAINTENANCEDC SPARK BOX BATTERY REPLACEMENT MAINTENANCEMAINTENANCE MAINTENANCEVALVE TRAY REPLACEMENT Latch Location LatchDC Spark Box MAINTENANCEMAINTENANCE DC Spark BoxPARTS LIST PARTS LISTMAIN ASSEMBLY Part #PARTS LIST PARTS LISTPARTS LIST PARTS LISTBURNER & LOG ASSEMBLY Part #Conditions WARRANTYThe Warranty: Limited Lifetime ExclusionsSee the inside back cover for details