Regency L676-LP1 Operating Instructions, Matching Remote Control & Receiver Code, First Fire

Page 38
OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS

OPERATION

OPERATING

INSTRUCTIONS

1)Read and understand these instructions before operating this appliance.

2)Check to see that all wiring is correct and enclosed to prevent possible shock.

3)Check to ensure there are no gas leaks.

4)Make sure the glass in the door frame is properly positioned. Never operate the appliance with the glass removed.

5)Verify that the venting and cap are unobstructed.

6)Ensure that the brick panels are installed.

7)Verify log placement. If the pilot cannot be seen when lighting the unit, the logs have been incorrectly positioned.

8)The unit should never be turned off, and on again without a minimum of a 60 second wait.

MATCHING REMOTE

CONTROL & RECEIVER

CODE

The Remote Control Handset has a set of unique ID codes that is pre-programmed into its memory. This set of ID codes helps to differentiate one Remote Control Handset from another so that only the control box with a matching ID code will respond to the appropriate Remote Control Handset.

To ensure the remote control is matched to the receiver correctly, please follow the steps below:

1)Install 4 "AA" batteries into the receiver.

2)Turn the 3-way switch on the receiver to the "Remote" position.

3)Using a small pointy object (ie. the end of a paper clip) press the button marked "PRG" on the receiver. The receiver will beep 3 times to indicate that it is ready to synchronize with the remote control.

4)Install 3 "AAA' batteries into the remote con- trol and push the "ON" button. The receiver will beep 4 times to indicate the remote control's command has been accepted and sets to the particular code of that remote control.

LIGHTING

PROCEDURE

IMPORTANT

To ignite or reignite the pilot, you must first remove the glass door.

NOTE: The Gas ON/OFF knob cannot be turned from "ON", "PILOT" or "OFF" unless it is partially depressed.

1)Ensure the 3-way switch on the wall mounted receiver is in the "OFF" position.

2)Turn the gas control knob so the indicator points to the "OFF" position and wait 5 min- utes for any gas in the combustion chamber to escape.

3)Turn the gas control knob counterclockwise so the indicator points to the "PILOT" position. Depress the gas control knob fully. Depress the igniter button until the pilot lights. After approximately one minute, release the gas control knob. The pilot flame should continue to burn.

Only when the pilot holds, without pressure being applied to the gas control knob, re-install the glass door to the unit. The unit must not be operated without the glass door in place.

If the pilot does not remain lit, repeat opera- tion allowing a longer period before releasing gas control knob.

4)When the pilot stays lit, turn the gas control knob to the "ON" position.

5)Use the wall switch or remote control to turn the unit ON.

NOTE: When using the remote control refer to the remote manual.

SHUTDOWN

PROCEDURE

1)Turn the 3-way switch on the wall mounted receiver to the "OFF" position.

2)Press "OFF" on the remote control.

3)Turn the gas control knob to the "OFF" posi- tion to turn off the pilot.

FIRST FIRE

The FIRST FIRE in your heater is part of the paint curing process. To ensure the paint is properly cured, it is recommended you burn your fireplace for at least four (4) hours the first time.

When first operated, the unit will release an odour caused by the curing of the paint and the burning off of any oils remaining from manufac- turing. Smoke detectors in the house may go off at this time. Open a few windows to ventilate the room for a couple of hours. The glass may require cleaning.

NOTE: When the glass is cold and the appliance is lit, it may cause condensation and fog the glass. This condensation is normal and will disappear in a few minutes as the glass heats up.

DO NOT ATTEMPT TO CLEAN THE GLASS WHILE IT IS STILL HOT!

DO NOT BURN THE UNIT WITHOUT THE GLASS DOOR IN PLACE.

During the first few fires, a white film may develop on the glass front as part of the curing process. The glass should be cleaned after the unit has cooled down or the film will bake on and become very difficult to remove. Use a non-abrasive cleaner and DO NOTATTEMPT TO CLEAN THE GLASS WHILE IT IS HOT.

38

Regency® L676-1 Direct Vent Gas Fireplace

Image 38
Contents LIBERTY L676-1Gas Fireplace Congratulations MANUFACTURED MOBILE HOME REQUIREMENTSINSTALLATION TABLE OF CONTENTSSAFETY LABEL WARRANTYSAFETY LABEL INSTALLATIONMA Code - CO Detector REQUIREMENTSINSTALLATION 5.08: Modifications to NFPA-54,ChapterRegency L676-1Direct Vent Gas Fireplace UNIT DIMENSIONSINSTALLATION INSTALLATION CHECKLIST INSTALLATIONGENERAL SAFETY INFORMATION INSTALLATIONDiagram INSTALLATIONINSTALLATION HEAT RELEASE KITClearance to Combustibles from INSTALLATIONCLEARANCES Minimum Clearance from Top of Front FacingMANTEL CLEARANCES INSTALLATIONINSTALLATION MANTEL LEG CLEARANCESDiagram Diagram INSTALLATIONINSTALLATION DiagramINSTALLATION INSTALLATIONUNIT ASSEMBLY PRIOR TO INSTALLATION FINISHING TEMPLATEVENT RESTRICTOR POSITION INSTALLATIONINSTALLATION Vent Restrictor PlateEXTERIOR VENT TERMINATION REQUIREMENTS INSTALLATIONINSTALLATION Minimum Clearance RequirementsVENTING ARRANGEMENTS INSTALLATIONINSTALLATION FPI Kit #When using Rigid Vent other than INSTALLATIONINSTALLATION RIGID PIPE VENTING SYSTEMSINSTALLATION INSTALLATION5” X 8” RIGID PIPE CROSS REFERENCE CHART Regency L676-1Direct Vent Gas Fireplace INSTALLATIONINSTALLATION VENT RESTRICTOR SETTING INSTALLATIONINSTALLATION VENTING ARRANGEMENTSHorizontal Venting with Two 2 90o Elbows INSTALLATIONINSTALLATION Horizontal Venting with Three 3 90o ElbowsVENT RESTRICTOR SETTING INSTALLATIONINSTALLATION Vertical Venting with Three 3 90o ElbowsVENTING ARRANGEMENTS INSTALLATIONINSTALLATION ALLOWABLE VERTICAL TERMINATIONSINSTALLATION INSTALLATIONUNIT INSTALLATION WITH HORIZONTAL TERMINATION DiagramINSTALLATION INSTALLATIONUNIT INSTALLATION WITH VERTICAL TERMINATION DiagramINSTALLATION INSTALLATIONUNIT INSTALLATION ASTROCAP XL DIMENSIONS 946-623/PGAS LINE INSTALLATION INSTALLATIONPILOT ADJUSTMENT TESTINGWIRING DIAGRAM INSTALLATIONAERATION ADJUSTMENT INSTALLATIONCONVERSION KIT #522-969FROM NG TO LP INSTALLATIONINSTALLATION LP Conversion Kit ContainsNOTE Once the unit has been installed INSTALLATIONINSTALLATION Burner TubeINSTALLATION INSTALLATIONBRICK PANEL INSTALLATION Diagram Right Side Rod with Screen RemovedBurner Orifi ce Cover Plate Diagram INSTALLATIONINSTALLATION DiagramINSTALLATION INSTALLATIONLOG SET INSTALLATION Log kit # 522-930contains the following pieces5 Fit log A into the pins on the log tray INSTALLATIONINSTALLATION 7 Fit log E into the pin at the center of log AF BA C INSTALLATIONINSTALLATION 1st Grate PostCompleted Log Set Installation INSTALLATIONINSTALLATION E F A B CINSTALLATION INSTALLATIONMESH PULL SCREEN INSTALLATION Left Side Rod Right Side RodFinal Installation L900-1 OPTIONAL ANDIRON INSTALLATIONINSTALLATION Log GLIGHTING PROCEDURE OPERATING INSTRUCTIONSMATCHING REMOTE CONTROL & RECEIVER CODE SHUTDOWN PROCEDURECOPY OF LIGHTING PLATE INSTRUCTIONS OPERATING INSTRUCTIONSNORMAL OPERATING SOUNDS OF GAS APPLIANCES DO NOT REMOVE THIS INSTRUCTION PLATELOG REPLACEMENT MAINTENANCEMAINTENANCE INSTRUCTIONS GENERAL VENT MAINTENANCEDC SPARK BOX REPLACEMENT MAINTENANCEDC SPARK BOX BATTERY REPLACEMENT MAINTENANCEMAINTENANCE MAINTENANCEVALVE TRAY REPLACEMENT Latch Location LatchDC Spark Box MAINTENANCEMAINTENANCE DC Spark BoxPARTS LIST PARTS LISTMAIN ASSEMBLY Part #PARTS LIST PARTS LISTPARTS LIST PARTS LISTBURNER & LOG ASSEMBLY Part #Conditions WARRANTYThe Warranty: Limited Lifetime ExclusionsSee the inside back cover for details