Regency G36D installation manual Mantel LEG Clearances, Framing Finishing

Page 7

INSTALLATION

CLEARANCES

The clearances listed below are Minimum distances unless otherwise stated:

A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions.

Clearance to Combustibles from:

 

Back

0"

(0mm)

Side

0"

(0mm)

Floor

0"

(0mm)

NOTE: The minimum floor clearance must be maintained from the top surface of the carpeting, tile, etc.

Minimum Clearance from Top of Unit to:

Mantel* Minimum 7" (177mm) Ceiling from top of unit. 32" (1016mm)

Side Wall Clearance

 

 

Flush Front

6"

(152mm)

Horizontal Vent Clearances

 

 

Top

2-1/2" (64mm)

Side

1-1/2" (38mm)

Bottom

1-1/2" (38mm)

Vertical Vent Clearances

1-1/4" (32mm)

Alcove Clearances**:

 

 

Max. Depth

36"

(914mm)

Min. Width

48"

1219mm)

Min. Height

72"

1829mm)

*see mantle clearance instructions in the "Combustible Mantels " section.

MANTEL LEG

CLEARANCES

Combustible mantel leg clearances as per diagram below:

Maximum 1-1/2" projection at 2" minimum clearance.

FRAMING AND

FINISHING

1)Determine the total thickness of facing material (e.g. drywall plus ceramic tiles) to allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1-1/4" (32mm) thick.

2)Frame in the enclosure for the unit with framing material. The framed opening is 37-1/4" high x 36-1/4" wide x 17-3/8" deep (946mm high x 921mm wide x 441mm deep).

Framing Dimensions

A B C D

36-1/4" 37-1/4" 17-3/8" 46-1/2"*

921mm 946mm 441mm 1181mm*

*'D' is Minimum height to combustible materials including the Minimum 2-1/2" (64mm) Top clearance to the Horizontal Vent.

WARNING:

Fire hazard is an extreme risk if these clearances are not adhered to.

It is of greatest importance that this fireplace and vent system be installed only in accordance with these instructions.

Install Side Nailing Strips, Top Facing Support, and Top Standoffs before unit is slipped into position. See the "Unit Aseembly Prior to Installation" section for assembly details.

3)For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.)

4)The top of the unit must not be closer than 32" (813mm) to the ceiling.

he HeatWave Duct Kit has different clearance and framing

equirements, check the HeatWave manual for details.

UltraGlow® G36D Zero Clearance Direct Vent Gas Fireplace

7

Image 7
Contents 12/18/05 G36D Zero Clearance Direct Vent Gas FireplaceTo the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Certified for/Certifiée pour Canada and U.S.A Safety LabelCopy of Safety Decal for G36D-NG1 300Before YOU Start InstallationInstallation Checklist Important Message Save These InstructionsManufactured Mobile Home Additional Requirements G36D Unit DimensionsDiagram Locating Your GAS StoveMantel LEG Clearances ClearancesFraming Finishing Combustible Mantels Top Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionVertical Termination Area where terminal is not permitedExterior Vent LocationsVenting Secure Vent Rigid Pipe Venting Components ListAlternate Rigid Pipe Venting SystemsUltraGlow Direct Vent System Flex Rigid Pipe Venting Arrangements Horizontal TerminationsInstallation Rigid Pipe Venting Arrangements Vertical Terminations Installation Flex Liner Vertical Termination With CO-LINEAR Flex SystemRequired Parts DescriptionVenting Arrangements Vertical Terminations I g h t Achieved Diagram 3aSnorkel Terminations Continue to assemble pipe lengths Firestop spacer must be installedDiagram Roof Pitch Ceiling to the positionOffset Chart Installation ProceduresFor UltraGlow Direct Vent System Flex High Elevation Pilot AdjustmentGAS Line Installation GAS Pipe Pressure TestingDC Sparker Kit Contains Qty Installation of LPG Conversion KitLPG Conversion Kit Contains QtyPiezo Ignitor Ignitor WireSparker Ignitor Wire Ground Wire from KitHeat Shield Install the 1/2 bushing to the heat shieldChain 02-75 02-55 02-52 LOG SET Installation02-53 02-51 02-54 Front Brackets 5th Grate TabLog indentation Rear Grate TabPlace embers in these 3 locations On the burner tray Install fl ush glass as per instructions in manualFlush Louvers Standard Flush DoorOptional Flush Trim Wall Thermostat Remote ControlWall Switch Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramTo Remove the Fan Installing the Optional FANOpen the bottom louver door Operating Instructions Copy of the Lighting Plate Instructions Maintenance InstructionsNormal Operating Sounds of GAS Appliances Maintenance Removing Valve Installing ValveG36D Main Assembly Pilot Assembly Gasket Parts ListG36D Flush Front Assembly UltraGlow G36D Zero Clearance Direct Vent Gas Fireplace UltraGlow G36D Zero Clearance Direct Vent Gas Fireplace Conditions WarrantyExclusions Register your UltraGlow online at