Regency G36D installation manual LOG SET Installation, 02-75 02-55 02-52, 02-53 02-51 02-54

Page 27

INSTALLATION

LOG SET INSTALLATION

Read the instructions below carefully and refer to the diagrams. If logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation.

The gas log kit (Part # 780-930) contains the following pieces:

a)02-75 Rear Log

b)02-55 Middle Left Log

c)02-50 Front Left Log

d)02-53 Center Left Log

e)02-51 Front Bottom Log

f)02-54 Center Right Log

g)02-52 Middle Right Log

h)

Embers

 

902-156

i)

Vermiculite

 

902-179

 

02-75

02-55

02-52

BracketBracket

02-75

02-51

02-51

Notch

 

02-50

02-53

02-51

02-54

The "02" refer numbers (i.e. 02-75) are molded into the rear of each log.

1)Carefully remove the logs from the box and unwrap them. The logs are fragile, handle with care - do not force into position.

2)Sprinkle the vermiculite all over the top of the base brick panel.

3)Place Log 02-75 on the rear log support pins with the fl at side to the back.

5)Position Log 02-53 across the cutouts in Logs 02-75 and 02-51 with the notch on the left side of the log fi tting into the 2nd grate tab.

02-53

02-75

02-75

Support Pins

4)Place Log 02-51 on the front right side of the burner. Push the back of the log against the 2 brackets with the notch on the bottom right side of the log fi tting into the right side of the grate.

2nd Grate Tab

02-51

Cutouts

02-51

UltraGlow® G36D Zero Clearance Direct Vent Gas Fireplace

27

Image 27
Contents 12/18/05 G36D Zero Clearance Direct Vent Gas FireplaceTo the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Certified for/Certifiée pour Canada and U.S.A Safety LabelCopy of Safety Decal for G36D-NG1 300Before YOU Start InstallationInstallation Checklist Important Message Save These InstructionsManufactured Mobile Home Additional Requirements G36D Unit DimensionsDiagram Locating Your GAS StoveClearances Mantel LEG ClearancesFraming Finishing Combustible Mantels Top Facing Support Side Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionVertical Termination Area where terminal is not permitedExterior Vent LocationsVenting Secure Vent Rigid Pipe Venting Components ListAlternate Rigid Pipe Venting SystemsUltraGlow Direct Vent System Flex Rigid Pipe Venting Arrangements Horizontal TerminationsInstallation Rigid Pipe Venting Arrangements Vertical Terminations Installation Flex Liner Vertical Termination With CO-LINEAR Flex SystemRequired Parts DescriptionVenting Arrangements Vertical Terminations Diagram 3a I g h t AchievedSnorkel Terminations Continue to assemble pipe lengths Firestop spacer must be installedDiagram Roof Pitch Ceiling to the positionInstallation Procedures Offset ChartFor UltraGlow Direct Vent System Flex High Elevation Pilot AdjustmentGAS Line Installation GAS Pipe Pressure TestingDC Sparker Kit Contains Qty Installation of LPG Conversion KitLPG Conversion Kit Contains QtyPiezo Ignitor Ignitor WireSparker Ignitor Wire Ground Wire from KitInstall the 1/2 bushing to the heat shield Heat ShieldChain LOG SET Installation 02-75 02-55 02-5202-53 02-51 02-54 Front Brackets 5th Grate TabLog indentation Rear Grate TabPlace embers in these 3 locations On the burner tray Install fl ush glass as per instructions in manualStandard Flush Door Flush LouversOptional Flush Trim Wall Thermostat Remote ControlWall Switch Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramInstalling the Optional FAN To Remove the FanOpen the bottom louver door Operating Instructions Maintenance Instructions Copy of the Lighting Plate InstructionsNormal Operating Sounds of GAS Appliances Maintenance Removing Valve Installing ValveG36D Main Assembly Pilot Assembly Gasket Parts ListG36D Flush Front Assembly UltraGlow G36D Zero Clearance Direct Vent Gas Fireplace UltraGlow G36D Zero Clearance Direct Vent Gas Fireplace Warranty ConditionsExclusions Register your UltraGlow online at