Wayne-Dalton 9800 Installation, Attaching Fully Adjustable Flagangle to Vertical Track

Page 11

Installation

IMPORTANT: Read instructions titled “p4” “Removing the old door” on page 9 and “p5” “PREPARING THE OPENING” on page 10 before attempting door installation.

IMPORTANT: Stainless steel or PT 2000 coated lag screws MUST be used when installing center bearing brackets, end brackets, jamb brackets, operator mounting/support brackets and disconnect brackets on treated lumber (preservative-treated). Stainless steel lag screws are NOT necessary when installing products on untreated lumber.

NOTE: It is recommended that 5/16” x 2” lag screws be pilot drilled using a 3/16” drill bit, and 1/4” x 2” lag screws and 1/4” x 1-1/2” lag screws be pilot drilled using a 1/8” drill bit, prior to fastening.

 

 

 

1

Attaching Fully Adjustable

 

 

Flagangle to Vertical Track

 

 

 

fully

Tools Needed:

 

Hand tighten the flagangle to the

adjustable

 

flagangle

 

vertical track using (2) 1/4”- 20 x 5/8”

None

 

carriage bolts and (2) 1/4”- 20 flange

 

 

(2) 1/4”- 20

 

hex nuts. Secure the flange nuts after

 

flagangle spacing is complete (Step 9).

Flange hex Nuts

 

 

(2) 1/4”- 20 x 5/8” carriage bolts

vertical track

Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts

11

You May Need. You can reach us Toll Free at 1-888-827-3667 for Consumer Assistance or online at www.wayne-dalton.com

Image 11
Contents Portland Source Plant SeriesTable of Contents Package Contents Door Section Identification Saw horses pair Power DrillTools Required Experienced door technician. Instead have Spring when the set screws areTorsion Spring Removal For Standard Lift Failure to use approvedUnwind Springs TorqueMaster Spring Removal Bracket and Drive Gear Removing the Old Door Extension Spring RemovalMounting pad to structurally sound Preparing the OpeningFailure to securely Attach a suitableNone Carriage bolts and 2 1/4- 20 flange InstallationAttaching Fully Adjustable Flagangle to Vertical Track Hand tighten the flagangle toInstalling Fully Adjustable Jamb Brackets Bottom Section Counterbalance CablesPosition the left hand vertical track Vertical TrackTools Needed Important The tops Side, must be raised the height ShimStacking Sections Top Brackets Properly ANY U-BARS Provided with DOOR. the InstallationOperator Bracket To this DOOR, a WAYNE-DALTONDoor Operation Top SectionDo not Raise Door Until Horizontal Attaching Horizontal Track to AdjustableAdjusting Top Brackets FlagangleCenter Bearing Bracket Side Torsion Spring AssemblyNylon Center Bushing Important do not USE Impact GUN To Wind Springs Securing DoorFor Spring Winding Winding Torsion Springs Otherwise door could fall Resulting in severe injury or Rear SupportKeep horizontal track Parallel and within 3/4 Maximum of door edgeSet screws in the winding cone To adjust spring tension, fully closeThird roller. Insert a winding bar into Winding bar while carefully looseningPull Rope Side LockOperator Framing Members Perforated Angle Trolley OperatorHeader Door ARM to Operator Bracket Perforated OPERATORangle railPainting CleaningPainting Lifetime Limited Warranty Model Thank you for your purchase /or Ship Any Parts You May Need
Related manuals
Manual 20 pages 42.88 Kb Manual 4 pages 60.02 Kb Manual 26 pages 11.64 Kb Manual 38 pages 17.26 Kb Manual 18 pages 4.37 Kb