Wayne-Dalton 9800 installation instructions Stacking Sections

Page 15

 

 

6

Stacking Sections

 

 

 

Tools Needed:

NOTE: For door section identification

Power Drill

see page 4.

 

7/16” Socket

NOTE: Make sure hinge leafs are

Driver

flipped down, when stacking another

 

section on top.

 

Place rollers in hinge tubes of the

 

second section (lock section).

 

With assistance, lift the second section

 

and guide rollers into the vertical

 

tracks.

 

Keep sections vertically aligned and

 

fasten hinges to connect the sections

 

using 1/4”- 14 x 5/8” self tapping

 

screws.

 

Repeat for other section(s) except top

 

section.

 

IMPORTANT: End Hinges have (2)

 

screws and Intermediate hinges

 

have (3) screws.

 

NOTE: Install lock at this time (sold

 

separately). See instructions in

 

OPTIONAL SIDELOCK INSTALLATION on

 

page 27.

LOCK SECTION

(2) 1/4”-14 X 5/8”

SELF TAPPING SCREWS

end hinges (left hand shown, right hinge symmetrically opposite)

(3)1/4”-14 X 5/8” SELF TAPPING SCREWS

INSTALLATION

intermediate hinges

Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts 15 You May Need. You can reach us Toll Free at 1-888-827-3667 for Consumer Assistance or online at www.wayne-dalton.com

Image 15
Contents Portland Source Plant SeriesTable of Contents Package Contents Door Section Identification Power Drill Tools RequiredSaw horses pair Experienced door technician. Instead have Spring when the set screws areTorsion Spring Removal For Standard Lift Failure to use approvedUnwind Springs TorqueMaster Spring RemovalBracket and Drive Gear Removing the Old Door Extension Spring RemovalMounting pad to structurally sound Preparing the OpeningFailure to securely Attach a suitableNone Carriage bolts and 2 1/4- 20 flange InstallationAttaching Fully Adjustable Flagangle to Vertical Track Hand tighten the flagangle to Installing Fully Adjustable Jamb Brackets Bottom Section Counterbalance CablesPosition the left hand vertical track Vertical TrackTools Needed Important The tops Side, must be raised the height ShimStacking Sections Top Brackets Properly ANY U-BARS Provided with DOOR. the InstallationOperator Bracket To this DOOR, a WAYNE-DALTONDoor Operation Top SectionDo not Raise Door Until Horizontal Attaching Horizontal Track to AdjustableAdjusting Top Brackets FlagangleCenter Bearing Bracket Side Torsion Spring AssemblyNylon Center Bushing Securing Door For Spring WindingImportant do not USE Impact GUN To Wind Springs Winding Torsion Springs Otherwise door could fall Resulting in severe injury or Rear SupportKeep horizontal track Parallel and within 3/4 Maximum of door edgeSet screws in the winding cone To adjust spring tension, fully closeThird roller. Insert a winding bar into Winding bar while carefully looseningPull Rope Side LockOperator Framing Members Perforated Angle Trolley OperatorHeader Door ARM to Operator Bracket Perforated OPERATORangle railPainting CleaningPainting Lifetime Limited Warranty Model Thank you for your purchase /or Ship Any Parts You May Need
Related manuals
Manual 20 pages 42.88 Kb Manual 4 pages 60.02 Kb Manual 26 pages 11.64 Kb Manual 38 pages 17.26 Kb Manual 18 pages 4.37 Kb