Wayne-Dalton 9800 installation instructions Top Section, Door Operation

Page 18

9

Top Section

 

 

 

Tools Needed:

Place the top section in the opening

door width

 

and vertically align with lower sections.

Hammer

+3-3/8” to 3-1/2”

 

Tape Measure

Temporarily secure the top section by

 

driving a nail in the header near the

 

 

 

Power Drill

center of the door and bending it over

 

 

the top section.

 

7/16” Socket

 

 

Driver

Now flip up hinge leaf against section,

 

 

fastening center hinges first, and end

 

 

hinges last. (Refer to Step 6).

 

When installing a door with a torsion counterbalance system, vertical track alignment is critical. Position flagangle between 1-11/16” (43 mm) to 1-3/4” (44 mm) from the edge of the door. Tighten the bottom lag screw. Flagangles must be parallel to the door sections.

Repeat for opposite side.

IMPORTANT: THE DIMENSION

 

 

 

BETWEEN THE FLAGANGLES MUST BE

 

 

 

DOOR WIDTH PLUS 3-3/8” (86MM) TO

 

 

 

3-1/2” (89 MM) FOR SMOOTH, SAFE

NAIL

 

vERTICAL tRACK

DOOR OPERATION.

 

 

 

 

 

Complete the vertical track installation

 

 

 

by securing the center jamb bracket(s)

 

 

ROLLER

and tightening the other lag screws.

 

 

 

Push the vertical track against the

 

 

 

rollers so that the rollers are touching

 

 

 

the deepest part of the curved side of

 

 

 

the track (see illustration). Tighten all

 

top section

ROLLER Against

the carriage bolts and nuts.

 

 

 

 

VERTICAL TRACK

 

 

 

Repeat for opposite side.

 

 

 

 

 

 

1-11/16” TO 1-3/4”

top

SECTION

FLAGANGLE

18Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts

You May Need. You can reach us Toll Free at 1-888-827-3667 for Consumer Assistance or online at www.wayne-dalton.com

Image 18
Contents Series Portland Source PlantTable of Contents Package Contents Door Section Identification Power Drill Tools RequiredSaw horses pair Failure to use approved Spring when the set screws areTorsion Spring Removal For Standard Lift Experienced door technician. Instead haveTorqueMaster Spring Removal Unwind SpringsBracket and Drive Gear Extension Spring Removal Removing the Old DoorAttach a suitable Preparing the OpeningFailure to securely Mounting pad to structurally soundHand tighten the flagangle to InstallationAttaching Fully Adjustable Flagangle to Vertical Track None Carriage bolts and 2 1/4- 20 flangeInstalling Fully Adjustable Jamb Brackets Counterbalance Cables Bottom SectionSide, must be raised the height Shim Vertical TrackTools Needed Important The tops Position the left hand vertical track Stacking Sections Top Brackets To this DOOR, a WAYNE-DALTON ANY U-BARS Provided with DOOR. the InstallationOperator Bracket ProperlyTop Section Door OperationFlagangle Attaching Horizontal Track to AdjustableAdjusting Top Brackets Do not Raise Door Until HorizontalCenter Bearing Bracket Torsion Spring Assembly SideNylon Center Bushing Securing Door For Spring WindingImportant do not USE Impact GUN To Wind Springs Winding Torsion Springs Parallel and within 3/4 Maximum of door edge Rear SupportKeep horizontal track Otherwise door could fall Resulting in severe injury orWinding bar while carefully loosening To adjust spring tension, fully closeThird roller. Insert a winding bar into Set screws in the winding coneSide Lock Pull RopePerforated OPERATORangle rail Trolley OperatorHeader Door ARM to Operator Bracket Operator Framing Members Perforated AngleCleaning PaintingPainting Lifetime Limited Warranty Model /or Ship Any Parts You May Need Thank you for your purchase
Related manuals
Manual 20 pages 42.88 Kb Manual 4 pages 60.02 Kb Manual 26 pages 11.64 Kb Manual 38 pages 17.26 Kb Manual 18 pages 4.37 Kb