9 | Top Section |
| |
|
| ||
Tools Needed: | Place the top section in the opening | door width | |
| and vertically align with lower sections. | ||
Hammer | |||
| |||
Tape Measure | Temporarily secure the top section by |
| |
driving a nail in the header near the |
| ||
|
| ||
Power Drill | center of the door and bending it over |
| |
| the top section. |
| |
7/16” Socket |
|
| |
Driver | Now flip up hinge leaf against section, |
| |
| fastening center hinges first, and end |
| |
| hinges last. (Refer to Step 6). |
|
When installing a door with a torsion counterbalance system, vertical track alignment is critical. Position flagangle between
Repeat for opposite side.
IMPORTANT: THE DIMENSION |
|
|
|
BETWEEN THE FLAGANGLES MUST BE |
|
|
|
DOOR WIDTH PLUS |
|
|
|
NAIL |
| vERTICAL tRACK | |
DOOR OPERATION. |
|
| |
|
|
| |
Complete the vertical track installation |
|
|
|
by securing the center jamb bracket(s) |
|
| ROLLER |
and tightening the other lag screws. |
|
|
|
Push the vertical track against the |
|
|
|
rollers so that the rollers are touching |
|
|
|
the deepest part of the curved side of |
|
|
|
the track (see illustration). Tighten all |
| top section | ROLLER Against |
the carriage bolts and nuts. |
|
| |
|
| VERTICAL TRACK | |
|
|
| |
Repeat for opposite side. |
|
|
|
|
|
|
top
SECTION
FLAGANGLE
18Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts
You May Need. You can reach us Toll Free at