5 | Vertical Track | fLAGANGLE | |
5/16” x 2” | |||
| |||
|
| LAG SCREWS | |
Tools Needed: | IMPORTANT: The tops of the |
| |
3/16” Drill Bit | vertical tracks must be level |
| |
from side to side. If the bottom |
| ||
|
| ||
Power Drill | section was shimmed to level it. |
| |
The vertical track on the shimmed |
| ||
|
| ||
7/16” Socket | side, must be raised the height of |
| |
the shim. |
| ||
Driver |
| ||
|
| ||
Tape Measure | Position the left hand vertical track |
| |
Level | assembly over the rollers of the bottom | VERTICAL | |
section. Make sure the counterbalance | |||
TRACK | |||
(2) Vice Grips | cable is located between the rollers and | ASSEMBLY | |
the door jamb. | JAMB | ||
| |||
|
| ||
| Drill 3/16” pilot holes for the lag screws. | BRACKET | |
|
| ||
| Loosely fasten jamb brackets and |
| |
| flagangle to the jamb using 5/16” x 2” |
| |
| lag screws. |
|
Tighten lag screw securing bottom jamb bracket to jamb, to maintain 5/8” spacing.
Repeat for the right hand side. | BOTTOM |
SECTION
vertical track
BOTTOM SECTION
5/8”
roller
jamb bracket
LAG
SCREW locations
lag
screw
14Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts
You May Need. You can reach us Toll Free at