Wayne-Dalton 9800 installation instructions Trolley Operator, Header Door ARM to Operator Bracket

Page 28

 

 

Trolley Operator

 

 

 

 

 

 

 

 

Tools Needed:

 

WARNING

OPERATOR MUST BE TESTED

AT TIME OF INSTALLATION AND

MONTHLY THEREAFTER TO

ENSURE THAT DOOR REVERSES

ON CONTACT WITH 2 X 4 BOARD

LAID FLAT UNDER THE DOOR.

FAILURE TO ADJUST OPERATOR,

IF NECESSARY, CAN RESULT IN

SEVERE OR FATAL INJURY. IF YOUR

OPERATOR IS EQUIPPED WITH A

PHOTOELECTRIC EYE SYSTEM,

THEN THIS MUST BE TESTED

AT THE SAME TIME TO ENSURE

THAT DOOR DOES NOT CLOSE

AND A CLOSING DOOR OPENS IF

PHOTOELECTRIC EYE SYSTEM IS

OBSTRUCTED. FAILURE TO MAKE

ADJUSTMENTS, IF NECESSARY,

CAN RESULT IN SEVERE OR FATAL

INJURY.

1.Install operator rail 1/2” to 1-1/2” (13 - 38 mm) above high arc of top section of the door.

2.Mount operator to ceiling so that 1” to 1-1/2” (25 - 38 mm) clearance is maintained between trolley rail and top section when door is fully open (trolley rail will slope down towards rear).

3.Attach door arm to operator bracket installed in Step 8.

4.Attach operator rail to suitable mounting surface, 2 x 6 lumber minimum.

5.Attach operator to ceiling using perforated angle.

IMPORTANT: Angles must be securely attached to sound framing member(s).

SUITABLE MOUNTING

OPERATOR RAIL

SURFACE 2 X 6

 

LUMBER MINIMUM

 

HEADER

DOOR ARM TO OPERATOR BRACKET

perforated

OPERATORangle rail

OPERATOR

FRAMING MEMBERS

PERFORATED ANGLE

28Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts

You May Need. You can reach us Toll Free at 1-888-827-3667 for Consumer Assistance or online at www.wayne-dalton.com

Image 28
Contents Series Portland Source PlantTable of Contents Package Contents Door Section Identification Tools Required Power DrillSaw horses pair Spring when the set screws are Torsion Spring Removal For Standard LiftFailure to use approved Experienced door technician. Instead haveTorqueMaster Spring Removal Unwind SpringsBracket and Drive Gear Extension Spring Removal Removing the Old DoorPreparing the Opening Failure to securelyAttach a suitable Mounting pad to structurally soundInstallation Attaching Fully Adjustable Flagangle to Vertical TrackHand tighten the flagangle to None Carriage bolts and 2 1/4- 20 flangeInstalling Fully Adjustable Jamb Brackets Counterbalance Cables Bottom SectionVertical Track Tools Needed Important The topsSide, must be raised the height Shim Position the left hand vertical trackStacking Sections Top Brackets ANY U-BARS Provided with DOOR. the Installation Operator BracketTo this DOOR, a WAYNE-DALTON ProperlyTop Section Door OperationAttaching Horizontal Track to Adjustable Adjusting Top BracketsFlagangle Do not Raise Door Until HorizontalCenter Bearing Bracket Torsion Spring Assembly SideNylon Center Bushing For Spring Winding Securing DoorImportant do not USE Impact GUN To Wind Springs Winding Torsion Springs Rear Support Keep horizontal track Parallel and within 3/4 Maximum of door edge Otherwise door could fall Resulting in severe injury orTo adjust spring tension, fully close Third roller. Insert a winding bar intoWinding bar while carefully loosening Set screws in the winding coneSide Lock Pull RopeTrolley Operator Header Door ARM to Operator BracketPerforated OPERATORangle rail Operator Framing Members Perforated AngleCleaning PaintingPainting Lifetime Limited Warranty Model /or Ship Any Parts You May Need Thank you for your purchase
Related manuals
Manual 20 pages 42.88 Kb Manual 4 pages 60.02 Kb Manual 26 pages 11.64 Kb Manual 38 pages 17.26 Kb Manual 18 pages 4.37 Kb