Lochinvar 5 When using an existing vent system to install a new boiler, Products to avoid

Page 10

Installation & Operation Manual

1 Determine boiler location

Table 1A Corrosive Contaminants and Sources

Products to avoid:

Spray cans containing chloro/fluorocarbons

Permanent wave solutions

Chlorinated waxes/cleaners

Chlorine-based swimming pool chemicals

Calcium chloride used for thawing

Sodium chloride used for water softening

Refrigerant leaks

Paint or varnish removers

Hydrochloric acid/muriatic acid

Cements and glues

Antistatic fabric softeners used in clothes dryers

Chlorine-type bleaches, detergents, and cleaning solvents found in household laundry rooms

Adhesives used to fasten building products and other similar products

Areas likely to have contaminants

Dry cleaning/laundry areas and establishments

Swimming pools

Metal fabrication plants

Beauty shops

Refrigeration repair shops

Photo processing plants

Auto body shops

Plastic manufacturing plants

Furniture refinishing areas and establishments

New building construction

Remodeling areas

Garages with workshops

When using an existing vent system to install a new boiler:

￿WARNING Failure to follow all instructions can result in flue gas spillage and carbon monoxide

emissions, causing severe personal injury or death.

Check the following venting components before installing:

Material - For materials listed for use with this appliance, see Section 2 - General Venting. For polypropylene or stainless steel venting, an adapter of the same manufacturer must be used at the flue collar connection.

Size - To ensure proper pipe size is in place, see Table 2A. Check to see that this size is used throughout the vent system.

Manufacturer - For a stainless steel or polypropylene application, you must use only the listed manufacturers and their type product listed in Tables 2D and 2F for CAT IV positive pressure venting with flue producing condensate.

Supports - Non-combustible supports must be in place allowing a minimum 1/4" rise per foot. The supports should adequately prevent sagging and vertical slippage, by distributing the vent system weight. For additional information, consult the vent manufacturer’s instructions for installation.

Terminations - Carefully review Sections 2 through 4 to ensure requirements for the location of the vent and air terminations are met and orientation of these fit the appropriate image from the Sidewall or Vertical options listed in the General Venting Section. For stainless steel vent, only use terminations listed in Table 2F for the manufacturer of the installed vent.

Seal - With prior requirements met, the system should be tested to the procedure listed in parts (c) through (f) of the Removal of an Existing Boiler Section on page 11.

With polypropylene and stainless steel vent, seal and connect all pipe and components as specified by the vent manufacturer used; with PVC/CPVC vent, see the Installing Vent or Air Piping Section on page 19.

If any of these conditions are not met, ￿ WARNING the existing system must be updated or

replaced for that concern. Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.

10

Image 10
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingSync How it works BlowersModels 1.0 1.3 Ratings SyncDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Prevent combustion air contamination Provide air openings to roomFlooring and foundation Products to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Sidewall Vent General ventingDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingMaterials Air inlet pipe materialsOptional room air Vent fittings Material StandardVent pipe PrimerPolypropylene Centrotherm InnoFlue SW Duravent PolyproStainless steel vent Supplied with the vent systemVent/air termination sidewall Sidewall direct ventingDetermine location 2B Alternate Clearance to Gravity Air Inlets Prepare wall penetrations Found in this manualPrepare wall penetrations Alternate Field Supplied Options Multiple vent/air terminationsVent/air termination vertical Vertical direct ventingPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Near boiler piping connections Circulator sizingHot Water Generator pump sizing ExampleNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureInstallation must comply with Field wiringLine voltage connections Louver proving switch EnableOutdoor temperature sensor Flow switch field suppliedBoiler management system System supply sensor Wiring of the cascadeAlarm contacts Runtime contacts3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set Hot Water Generator HW operationOperating information GeneralProtection features Outdoor reset operation, if used Boiler temperature regulationCascade HW operation with cascade Sequence of the cascadeNight Setback operation with cascade Sequence of operation Sync control module 1Status ScreenOperating information 2Main Menu Screen Owner maintenance Maintenance Maintenance and annual startupService technician See the Sync User’s Information Manual for InstructionsMaintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionHandling ceramic fiber materials Niosh stated First AidDiagrams LOW Voltage 120 VAC High Voltage2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb

5 specifications

Lochinvar 5 is a cutting-edge residential boiler designed to meet the heating needs of modern homes while ensuring high efficiency and user convenience. As one of the latest offerings from Lochinvar, a trusted name in the heating industry, the Lochinvar 5 combines advanced technology with robust features that make it a top choice for homeowners and contractors alike.

One of the standout characteristics of the Lochinvar 5 is its impressive energy efficiency. It boasts an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, which significantly reduces fuel consumption compared to traditional heating systems. This not only translates to lower energy bills for homeowners but also minimizes the environmental impact, aligning with the growing demand for sustainable energy solutions.

The Lochinvar 5 employs a highly efficient modulating burner technology that optimizes fuel usage based on real-time heating demand. This ensures that the boiler operates at peak efficiency, providing consistent warmth without unnecessary energy waste. The inclusion of advanced controls further enhances its performance, allowing users to adjust settings easily and monitor usage through a user-friendly digital display.

Durability and reliability are also paramount in the design of the Lochinvar 5. Constructed with high-quality materials, this boiler is built to withstand the rigors of daily use and provide long-lasting performance. Its compact design allows for flexible installation options, making it suitable for various residential settings, even where space is limited.

In addition to its impressive performance metrics, Lochinvar 5 is equipped with smart technology features that cater to the needs of modern consumers. Wi-Fi connectivity enables remote monitoring and control via a mobile app, giving homeowners the ability to adjust settings on the go. This feature not only enhances user convenience but also allows for proactive maintenance and alerts, helping to prevent potential issues before they arise.

Safety is a key consideration in the design of Lochinvar 5. It includes multiple safety features, such as a sealed combustion system that minimizes the risk of carbon monoxide leaks and an advanced monitoring system that ensures optimal operating conditions at all times.

In conclusion, the Lochinvar 5 stands out as an exceptional choice for those seeking a reliable, efficient, and smart residential heating solution. Its combination of advanced technologies, user-friendly features, and robust construction make it a leading option in the boiler market, ready to meet the demands of today’s homeowners. With an eye on energy efficiency and ease of use, Lochinvar 5 is well-equipped to provide comfortable, cost-effective heating for years to come.