4 Vertical direct venting
Vent/air termination – vertical
WARNING Follow instructions below when determining vent location to avoid
possibility of severe personal injury, death or substantial property damage.
Determine location
Locate the vent/air terminations using the following guidelines:
1.The total length of piping for vent or air must not exceed the limits given in the General Venting Section on page 16 of this manual.
2.Prepare the vent termination and the air termination elbow (FIG.
3.The vent must terminate at least 3 feet above the highest place in which the vent penetrates the roof and at least 2 feet above any part of a building within 10 horizontal feet.
4.The air piping must terminate in a
5.The vent piping must terminate in an
6.Maintain the required dimensions of the finished termination piping as shown in FIG.
7.Do not extend exposed vent pipe outside of building more than shown in this document. Condensate could freeze and block vent pipe.
WARNING Rooftop vent and air inlet terminations must terminate in the same pressure
zone, unless vertical vent sidewall air is set up as shown in the General Venting - Vertical Vent, Sidewall Air Section.
26
Installation & Operation Manual
Figure 4-1 PVC/CPVC/Polypropylene Vertical Termination
of Air and Vent
ALTERNATE INTAKE LOCATIONS:
INTAKE PIPES MAY BE LOCATED
ANYWHERE WITHIN 24" (610 MM)
OF VENT PIPE
BIRD SCREEN
(TYPICAL)VENT
COUPLING
(FIELD SUPPLIED) 6" (152 MM) MINIMUM
ABOVE ROOF / SNOW LINE
VENT OUTLET | COMBUSTION | |
12" MINIMUM | ||
AIR | ||
ABOVE AIR INLET | ||
|
Figure 4-2 Stainless Steel Vertical Termination of Air
and Vent
ALTERNATE INTAKE LOCATIONS:
INTAKE PIPES MAY BE LOCATED
ANYWHERE WITHIN 24” (610 MM)
OF VENT PIPE
VENT | BIRD SCREEN |
(TYPICAL) |
6" (152 MM) MINIMUM
ABOVE ROOF /
SNOW LINE
COM,BUSTION
AIR
VENT OUTLET
36” (914 MM) MINIMUM
ABOVE AIR INLET
5.Locate terminations so they are not likely to be damaged by foreign objects, such as stones or balls, or subject to buildup of leaves or sediment.
Prepare roof penetrations
1.Air pipe penetration:
a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.
2.Vent pipe penetration:
a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole with at least a 1/2 inch clearance around the vent pipe outer diameter:
•7½ inch (178 mm) hole for 6 inch (152 mm) vent pipe
•8½ inch (203 mm) hole for 7 inch (178 mm) vent pipe
b.Insert a galvanized metal thimble in the vent pipe hole (when required by local codes).
3.Space the air and vent holes to provide the minimum spacing shown in FIG.’s
4.Follow all local codes for isolation of vent pipe when passing through floors, ceilings, and roofs.
5.Provide flashing and sealing boots sized for the vent pipe and air pipe.