Lochinvar 5 operation manual Prepare wall penetrations, Found in this manual

Page 24

Installation & Operation Manual

3 Sidewall direct venting

Figure 3-3BAlternate Clearance to Forced Air Inlets w/ Field Supplied Fittings

8. PVC/CPVC terminations are designed to accommodate any

wall thickness of standard constructions per the directions

found in this manual.

7’ (2.1 M) MIN ABOVE ANY

PUBLIC WALKWAY

IF LESS

THAN 10’ (3 M)

36” (914 MM)

MIN

FORCED AIR

INLET

BIRD

SCREEN

(TYPICAL)

9. Stainless steel terminations are designed to penetrate walls

with a thickness up to 9.25 inches of standard construction.

Figure 3-4APVC/CPVC Sidewall Termination Assembly

 

VENT AIR

AIR PIPING

CENTERLINE WIDTH

VENT PIPING

 

 

VENT PLATE

WALL PLATE

VENT CAP

 

Prepare wall penetrations

1.Use the factory supplied wall plate as a template to locate the vent and air intake holes and mounting holes.

Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

Vent pipe penetration:

a. Cut a hole for the vent pipe. For either combustible

or noncombustible construction, size the vent pipe

hole with at least a 1/2 inch clearance around the

vent pipe outer diameter:

• 7½ inch hole for 6 inch vent pipe

• 8½ inch hole for 7 inch vent pipe

GALVANIZED

THIMBLE

Table 3C Sidewall Vent Centerline Dimensions

Model

Air

Vent

Centerline Width

 

 

 

 

All

6"

6"

7 3/4"

Figure 3-4BPolypropylene Sidewall Termination Assembly

Drill 3/16" diameter holes for inserting the plastic anchors into the wall.

2.

For Polypropylene Only: Install the vent and air intake

 

sidewall adapters from Table 2E on page 20 into the vent

 

plate. Slide the sidewall retaining bracket down the

 

sidewall adapters flush to the vent plate (FIG. 3-4B).

3.

For PVC/CPVC Only: Install the vent and air intake

 

piping through the wall into the vent plate openings.

 

Use RTV silicone sealant to seal the air pipe. Use the

 

cement/primer listed in Table 2C on page 19 to seal the

 

vent pipe.

4.

Mount and secure the vent plate to the wall, using stainless

 

steel screws.

5.

Seal all gaps between the pipes and wall. Seal around the

SIDEWALL ADAPTER (AIR)

SIDEWALL ADAPTER (VENT)

WALL

PLATE

SIDEWALL

RETAINING

PLATE

VENT

PLATE

VENT

CAP

 

plate to the wall assuring no air gaps.

6.

Assemble the vent cap to the vent plate (see FIG.’s 3-4A

 

and 3-4B). Insert the stainless steel screws into the vent

 

cap screw hole openings and securely attach the vent cap

 

to the vent plate.

7.

Seal all wall cavities.

GALVANIZED

IMG00085

THIMBLE

 

24

Image 24
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingSync How it works BlowersModels 1.0 1.3 Ratings SyncInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Provide air openings to room Prevent combustion air contaminationFlooring and foundation When using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room General venting Direct venting options Sidewall VentDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingMaterials Air inlet pipe materialsOptional room air Material Standard Vent pipeVent fittings PrimerPolypropylene Centrotherm InnoFlue SW Duravent PolyproStainless steel vent Supplied with the vent systemSidewall direct venting Vent/air termination sidewallDetermine location 2B Alternate Clearance to Gravity Air Inlets Prepare wall penetrations Found in this manualPrepare wall penetrations Alternate Field Supplied Options Multiple vent/air terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Near boiler piping connections Circulator sizingHot Water Generator pump sizing ExampleNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Enable Outdoor temperature sensorLouver proving switch Flow switch field suppliedSystem supply sensor Wiring of the cascade Alarm contactsBoiler management system Runtime contacts3Low Voltage Field Wiring Connections Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set Hot Water Generator HW operationOperating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if usedCascade Sequence of the cascade HW operation with cascadeNight Setback operation with cascade Sequence of operation Sync control module 1Status ScreenOperating information 2Main Menu Screen Maintenance Maintenance and annual startup Service technicianOwner maintenance See the Sync User’s Information Manual for InstructionsMaintenance Flue vent system and air piping Check water systemCheck expansion tank Check boiler relief valveCheck ignition ground wiring Check all boiler wiringCheck control settings Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionHandling ceramic fiber materials Niosh stated First AidDiagrams LOW Voltage 120 VAC High Voltage2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb

5 specifications

Lochinvar 5 is a cutting-edge residential boiler designed to meet the heating needs of modern homes while ensuring high efficiency and user convenience. As one of the latest offerings from Lochinvar, a trusted name in the heating industry, the Lochinvar 5 combines advanced technology with robust features that make it a top choice for homeowners and contractors alike.

One of the standout characteristics of the Lochinvar 5 is its impressive energy efficiency. It boasts an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, which significantly reduces fuel consumption compared to traditional heating systems. This not only translates to lower energy bills for homeowners but also minimizes the environmental impact, aligning with the growing demand for sustainable energy solutions.

The Lochinvar 5 employs a highly efficient modulating burner technology that optimizes fuel usage based on real-time heating demand. This ensures that the boiler operates at peak efficiency, providing consistent warmth without unnecessary energy waste. The inclusion of advanced controls further enhances its performance, allowing users to adjust settings easily and monitor usage through a user-friendly digital display.

Durability and reliability are also paramount in the design of the Lochinvar 5. Constructed with high-quality materials, this boiler is built to withstand the rigors of daily use and provide long-lasting performance. Its compact design allows for flexible installation options, making it suitable for various residential settings, even where space is limited.

In addition to its impressive performance metrics, Lochinvar 5 is equipped with smart technology features that cater to the needs of modern consumers. Wi-Fi connectivity enables remote monitoring and control via a mobile app, giving homeowners the ability to adjust settings on the go. This feature not only enhances user convenience but also allows for proactive maintenance and alerts, helping to prevent potential issues before they arise.

Safety is a key consideration in the design of Lochinvar 5. It includes multiple safety features, such as a sealed combustion system that minimizes the risk of carbon monoxide leaks and an advanced monitoring system that ensures optimal operating conditions at all times.

In conclusion, the Lochinvar 5 stands out as an exceptional choice for those seeking a reliable, efficient, and smart residential heating solution. Its combination of advanced technologies, user-friendly features, and robust construction make it a leading option in the boiler market, ready to meet the demands of today’s homeowners. With an eye on energy efficiency and ease of use, Lochinvar 5 is well-equipped to provide comfortable, cost-effective heating for years to come.